The judgment of the Township as to the method of sewage disposal
to be used will be made after study and review of a sewage feasibility
report submitted by the developer. The submission of such a report
may be waived by the Township where it is deemed unnecessary. When
required however, such report shall be prepared by an engineer or
other individual of demonstrated qualifications. In such cases, the
Township may also require a written review and/or recommendation from
the applicable sewer authority.
|
Following construction of the extension, which shall be inspected
by the Township Sewer Department and/or the Township Engineer, the
Township shall be provided with a report indicating such construction
was completed satisfactorily.
|
Following construction of the extension, the developer shall
provide the Township with an approved inspection report from the water
authority indicating that such construction was completed satisfactorily.
|
Construction
|
Minimum Size
| |
---|---|---|
Monument
|
Concrete or Stone
|
6 inches by 6 inches by 30 inches or 4 inches diam by 30 inches
|
Monument
|
Concrete-filled, Cast Iron Pipe
|
4 inches diameter by 30 inches
|
Marker
|
Iron Pipes or Iron or Steel Bars
|
3/4 inch by 30 inches
|
In subdivisions or land developments involving five or fewer
lots or dwelling units, the Township may approve the substitution
of iron pipes set in concrete for monuments.
|