A.
The Borough Engineer shall make the final determination on the continuing maintenance and inspection responsibilities prior to final approval of the SWM site plan. The Borough Engineer may require a dedication of such facilities as part of the requirements for approval of the SWM site plan. Such a requirement is not an indication that the Borough will accept the facilities. The Borough reserves the right to accept or reject the ownership and operating responsibility for any portion of the stormwater management controls. Prior to acceptance by the Borough, all newly installed storm sewer mains and lines shall be inspected by the Borough Engineer, and the person offering dedication shall pay the fee established in the amount and according to the formula set forth in Chapter 120, Fees.
B.
Facilities, areas, or structures used as stormwater management BMPs shall be enumerated as permanent real estate appurtenances and recorded as deed restrictions or conservation easements that run with the land.
C.
The operation and maintenance plan shall be recorded as a restrictive deed covenant that runs with the land.
D.
The Borough may take enforcement actions against an owner for any failure to satisfy the provisions of this article.