Editor's Note: Prior ordinance history: Ordinance Nos. 947-97 and 1011-03.
[Ord. 1120-13, eff. July 4, 2013]
The Director of Planning is hereby appointed to administer, implement, and enforce this chapter by granting or denying development permits in accord with its provisions.
[Ord. 1120-13, eff. July 4, 2013]
The duties and responsibilities of the Floodplain Administrator shall include, but not be limited to the following:
Permit requirements of this chapter have been satisfied, including determination of substantial improvement and substantial damage of existing structures;
The proposed development does not adversely affect the carrying capacity of areas where base flood elevations have been determined but a floodway has not been designated. This means that the cumulative effect of the proposed development when combined with all other existing and anticipated development will not increase the water surface elevation of the base flood more than one foot at any point within the City of Avalon; and
All Letters of Map Revision (LOMR's) for flood control projects are approved prior to the issuance of building permits. Building permits must not be issued based on Conditional Letters of Map Revision (CLOMR's). Approved CLOMR's allow construction of the proposed flood control project and land preparation as specified in the "start of construction" definition.
Using FEMA publication FEMA 213, "Answers to Questions About Substantially Damaged Buildings," develop detailed procedures for identifying and administering requirements for substantial improvement and substantial damage, to include defining "market value."
Review, Use and Development of Other Base Flood Data. When base flood elevation data has not been provided in accordance with § 6-9.302, the Floodplain Administrator shall obtain, review, and reasonably utilize any base flood elevation and floodway data available from a Federal or State agency, or other source, in order to administer Article 5.
NOTE: A base flood elevation may be obtained using one of two methods from the FEMA publication, FEMA 265, "Managing Floodplain Development in Approximate Zone A Areas — A Guide for Obtaining and Developing Base (100-year) Flood Elevations" dated July 1995.
Within six months of information becoming available or project completion, whichever comes first, the Floodplain Administrator shall submit or assure that the permit applicant submits technical or scientific data to FEMA for a Letter of Map Revision (LOMR).
All LOMR's for flood control projects are approved prior to the issuance of building permits. Building permits must not be issued based on Conditional Letters of Map Revision (CLOMR's). Approved CLOMR's allow construction of the proposed flood control project and land preparation as specified in the "start of construction" definition.
Such submissions are necessary so that upon confirmation of those physical changes affecting flooding conditions, risk premium rates and floodplain management requirements are based on current data.
Changes in corporate boundaries: Notify FEMA in writing whenever the corporate boundaries have been modified by annexation or other means and include a copy of a map of the community clearly delineating the new corporate limits.
Maintain a record of all variance actions, including justification for their issuance, and report such variances issued in its biennial report submitted to the Federal Emergency Management Agency.
Map Determination. Make interpretations where needed, as to the exact location of the boundaries of the areas of special flood hazard, where there appears to be a conflict between a mapped boundary and actual field conditions. The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in § 6-9.404.
Planning. Assure community's General Plan is consistent with floodplain management objectives herein.
[Ord. 1120-13, eff. July 4, 2013]
A development permit shall be obtained before any construction or other development, including manufactured homes, within any area of special flood hazard established in § 6-9.302. Application for a development permit shall be made on forms furnished by the City of Avalon. If the cumulative cost of improvements over a five-year period equals or exceeds 50% of the market value of the structure before the start of construction of the improvement, the structure must meet current floodplain management standards. The applicant shall provide the following minimum information:
Proposed elevation in relation to mean sea level to which any nonresidential structure will be floodproofed, as required in § 6-9.501(c)(2) of this chapter and detailed in FEMA Technical Bulletin TB 3-93.
Certification from a registered civil engineer or architect that the nonresidential floodproofed building meets the floodproofing criteria in § 6-9.501(c)(2).
For a crawl-space foundation, location and total net area of foundation openings as required in § 6-9.501(c)(3) of this chapter and detailed in FEMA Technical Bulletins 1-93 and 7-93.
All appropriate certifications listed in § 6-9.402(e) of this chapter.
[Ord. 1120-13, eff. July 4, 2013]
The City Council of the City of Avalon shall hear and decide appeals when it is alleged there is an error in any requirement, decision, or determination made by the Floodplain Administrator in the enforcement or administration of this chapter.