[Ord. No. 10-16, 7-13-2010]
A. 
It shall be the duty of the person designated by the Mayor as Zoning Administrator to administer and enforce the regulations contained herein.
B. 
Building Permit Required.
[Ord. No. 15-07, 12-10-2015]
1. 
It shall be unlawful to commence or to proceed with the erection, construction, reconstruction, conversion, alteration, enlargement, extension, raising or moving of any building or structure, or any portion thereof, without first having applied, in writing, to the Zoning Administrator for a building permit to do so and a building permit has been granted therefor.
2. 
Furthermore, prior to granting the requested permit, the Zoning Administrator shall request a "utility locate" for the immediate area of the proposed construction/alteration site. The City Utility Superintendent shall advise the Zoning Administrator concerning the presence of utility infrastructure at, or near, the proposed building/alteration site.
3. 
No permit shall be issued when the Zoning Administrator determines the proposed building/alteration would cover or interfere with utility management or maintenance.
C. 
Every application for a building permit shall be in writing and delivered to the Zoning Administrator and shall be accompanied by a detailed set of plans, in duplicate, showing the size of the proposed building or structure, its location on the lot, the materials of which it is to be constructed and the details and type of construction to be used. On the issuance of a permit, one (1) set of said plans shall be retained by the Zoning Administrator as a permanent record and one (1) set shall be returned to the applicant.
D. 
Blank forms shall be provided by the Zoning Administrator for the use of those applying for permits as provided for in this Chapter. Any permits issued by the Zoning Administrator shall be on standard forms for such purpose and furnished by the City.
E. 
A careful record of all such applications, plans, and permits shall be kept in the office of the Zoning Administrator. The fees to be charged for building permits will be proposed by the Board of Aldermen.
F. 
Any building permit under which no construction work has been commenced within six (6) months after the date of issue of said permit, or under which the proposed construction has not been completed within two (2) years of the date of issue, shall expire by limitation; and no work or operation shall take place under such permit after such expiration. A building permit may be once extended for a period not exceeding six (6) months by the Zoning Administrator.
G. 
No building permit shall be issued for and no building shall be erected on, any lot within the territorial jurisdiction of the City of Bismarck, unless the street giving access to the lot upon which the building is proposed to be placed conforms to the requirements of the Major Street Plan of the City of Bismarck, as provided in Section 89.460 and Section 89.470, Revised Statutes of the State of Missouri.
[Ord. No. 23-04, 2-16-2023]
The Bismarck City Code is hereby amended to add a twenty-five dollar ($25.00) Building Permit Application Fee, which shall be submitted with any application for construction for a new dwelling or a major remodeling of an existing dwelling.