[Ord. #7/15/74; Ord. #605-92; Ord. #660-84, § 1]
The township clerk or such other officer as may be designated is authorized to collect and receive the following fees and to issue such permits or licenses as may be required by ordinance.
July 1, 2011 thru June 30, 2012 | $2,400 |
July 1, 2012 thru June 30, 2013 and thereafter | $2,500 |
July 1, 2011 thru June 30, 2012 | $2,400 |
July 1, 2012 thru June 30, 2013 and thereafter | $2,500 |
Level One Activity (1 - 200) | |
First (50) receptacles, fixtures, devices | $60 |
Each additional block of (25) | $30 |
Level Two Activity (201 - 400) | |
First (50) receptacles, fixtures, devices | $40 |
Each additional block of (25) | $30 |
Level Three Activity (400+) | |
First (50) receptacles, fixtures, devices | $40 |
Each additional block of (25) | $50 |
For the purpose of computing this fee, receptacles, fixtures or devices shall include lighting fixtures, wall switches, convenience receptacles, sensors, dimmers, alarm devices, smoke and heat detectors, communications outlets, light-standards eight feet or less in height including luminaries, emergency lights, electric signs, exit lights or similar electric fixtures and devices rated 20 amperes or less including motors or equipment rated less than one horsepower (hp) or one kilowatt (kw). |
Initial inspection | $50* |
First reinspection | $0 |
All subsequent reinstallations | $50 per reinspection* |
Certificate | As set forth in the Uniform Fire Code N.J.A.C. 5:70-2.9(d) based on the amount at the time remaining before the change of occupancy/sale is expected at the time the application is received |
NOTES: | |
* | A no-show inspection shall be subject to a $50 fee payable prior to setting the next inspection. |
"No-show inspection" defined: | |
(1) | The owner/agent fails to meet the inspector within the appointed time for inspection or reinspection. |
(2) | The owner/agent does not have a key or is unable to give the inspector access to the premises for the scheduled inspection or reinspection. |
(3) | Electrical power to the premises is disconnected and the smoke alarms to be tested are powered by electrical current from the building wiring system. |
Initial inspection | $0 |
First reinspection | $0 |
All subsequent reinspections | $0 per reinspection |
Certificate | $0 |
Square Feet | Fee |
|---|---|
0 to 999 | $50 |
1,000 to 1,999 | $125 |
2,000 to 4,999 | $150 |
5,000 to 9,999 | $350 |
10,000 to 19,999 | $520 |
20,000 to 49,999 | $572 |
50,000 to 100,000 | $624* |
One- and two-story parking garages | $50 per deck |
Three or more multiple-story parking decks | $110 per deck |
NOTE: | |
* | An additional fee of $75 for each 50,000 square feet or part thereof above 100,000 square feet will be added to cover the expense of performing the fire safety inspection. |
Vaccine | Fee |
|---|---|
Pneumonia vaccination (non-Medicare) | $22 |
Influenza vaccination (if not senior or high risk) | $12 |
Hepatitis B (adult) per dose | $30 |
Hepatitis B (child - 18 years) per dose | $10 |
Hepatitis A (adult) per dose | $35 |
MMR (per dose) | $30 |
Varicella | $50 |
Lyme vaccine per dose | $50 |
Td (adult) | $20 |
Colon-Rectal Kit | $3 |
Type | Application Fee | Escrow Amount |
|---|---|---|
Up to 3 lots (with inclusion of original lot) | $300 | $1,250 per lot |
Amendments to approved applications | $150 | $1,000 |
Type | Application Fee | Escrow Amount |
|---|---|---|
Preliminary (with inclusion of original lot) | $450 plus $10 per lot | $2,000 plus $250 per lot |
Final (with inclusion of original lot) | $350 plus $10 per lot | $2,000 plus $200 per lot |
Preliminary and Final (with inclusion of original lot) | $750 plus $10 per lot | $4,000 plus $500 per lot |
Amendments or revalidation of approved applications | $350 | $2,500 plus $100 per lot |
Type | Application Fee | Escrow Amount |
|---|---|---|
Preliminary — nonresidential | $700 | $2,000 plus $0.15 per square foot for the first 15,000 square feet of net lot area and $0.05 per square foot for all net lot area in excess of 15,000 square feet. In cases where only a portion of the existing site is to be developed, the amount shall be based on the total area of disturbance, including grading and landscaping. The minimum escrow deposit fee shall be $2,000 and the maximum initial escrow deposit shall not exceed $20,000. |
Final — nonresidential | $600 | One-third of the total escrow deposit calculated for the preliminary submission. |
Preliminary and Final — nonresidential | $1,200 | $3,000 plus $0.15 per square foot for the first 15,000 square feet of net lot area and $0.05 per square foot for all net lot area in excess of 15,000 square feet. In cases where only a portion of the existing site is to be developed, the amount shall be based on the total area of disturbance, including grading and landscaping. The minimum escrow deposit shall be $3,000 and the maximum initial escrow deposit shall not exceed $25,000. |
Amendments to approved applications — nonresidential | $700 | $2,000 plus $0.15 per square foot for the first 15,000 square feet of net lot area and $0.05 per square foot for all net lot area in excess of 15,000 square feet. In cases where only a portion of the existing site is to be developed, the amount shall be based on the total area of disturbance, including grading and landscaping. The minimum escrow deposit fee shall be $3,000 and the maximum initial escrow deposit shall not exceed $20,000. |
Preliminary — residential | $300 | $1,500 plus $50 per unit for the first 50 units, plus $25 per unit for all units in excess of 50. The maximum initial escrow deposit shall not exceed $20,000. |
Final — residential | $300 | One-third of the total escrow deposit calculated for the preliminary submission. |
Preliminary and Final — residential | $600 | $2,500 plus $50 per unit for the first 50 units, plus $25 per unit for all units in excess of 50. The maximum initial escrow deposit shall not exceed $20,000. |
Amendments to approved applications — residential | $700 | $1,500 plus $50 per unit for the first 50 units, plus $25 per unit for all units in excess of 50. The minimum escrow deposit fee shall be $3,000 and the maximum initial escrow deposit shall not exceed $20,000. |
Site plan waiver request | $300 | $2,000 |
Type | Application Fee | Escrow Amount |
|---|---|---|
"C" Variance - residential | $150 | $1,250 |
"C" Variance - nonresidential | $250 | $2,500 |
"D" Variance - residential | $500 | $1,500 |
"D" Variance - nonresidential | $750 | $3,000 |
Type | Application Fee | Escrow Amount |
|---|---|---|
Appeal of decision of Zoning Officer | $350 | $1,500 |
Interpretation of Zoning Map or Ordinance | $350 | $1,500 |
Conditional use | $300 | $2,000 |
Conceptual Planning Board Review | $300 | $2,000 |
Pre-application Meeting with Board Professionals | $100 | $750 |
Certification of Pre-Existing Nonconforming Use or Structure | $300 | $1,500 |
Administrative Plan Signature Extension | $50 | — |
Board Extension of Time for Plan Signature | $150 | $500 |
Extension of Vesting Request | $250 | $1,000 |
General development plan or amendment | $1,000 | $7,500 |
Development permit pursuant to N.J.S.A. 40:55D-34 and/or 40:55D-35 | $500 | $3,000 |
Special meeting (scheduled and convened for the benefit of an applicant) | $150 | $1,000 |
Administrative Waiver of Site Plan Review (for each proposed modification(s) within a single lot. Individual buildings within the same lot shall be subject to a separate application fee. | $500 | N/A |
Type | Fee |
|---|---|
Copy of 2002 Master Plan Land Use and Conservation Elements | $35 |
Other Master Plan Elements | See Section 10-9.1 |
Amendments to Master Plan | See Section 10-9.1 |
Certificate as to approval of subdivision | $10 |
Information on CD (as available) | $5 each |
NOTE: Information that cannot be reproduced in-house will be sent to a reproduction center and their current rate will be charged. |
Deposit, per square yard | $20 |
Minimum per application | $140 |
Yearly User Fee Schedule (Applies to all resident nonprofit organizations and nonresident organizations who qualify for the bulk rate price.) | |
|---|---|
User | Fee, Yearly Per Organization |
Hopewell Twp. residents | No charge |
All other/nonresidents | $15 per nonresident participant |
Field and Court Use Fee Schedule (All rentals must be for at least 1.5 hours.) | |||||
|---|---|---|---|---|---|
User | Basketball/Tennis Court (per hour) | Grass Field (per hour) | Grass Field With Lights (per hour) | Turf Field (per hour) Permit Only | Turf Field With Lights (per hour) Permit Only |
HT Parks & Rec. Dept. | No charge | No charge | No charge | No charge | No charge |
HVRSD* | No charge | No charge | N/A | No charge | N/A |
Resident nonprofit | $20 | $20 | $60 | $40 | $80 |
Nonresident nonprofit | $30 | $30 | $70 | $60 | $120 |
Nonresident Nonprofit bulk rate** | $25 | $25 | $65 | $50 | $100 |
For profit (includes private lessons) | $40 | $40 | $80 | $80 | $160 |
Tournament surcharge per weekend*** | $225 | $225 | N/A | N/A | N/A |
* | No charge during established school use hours as per field use policy. |
** | Bulk rate applies to any nonresident nonprofit organization that uses a type of field/court for a minimum of 350 hours the previous year. |
*** | Because tournaments require additional service due to events, organizations will be billed for the field/court rental plus the tournament surcharge. |
Twin Pines/Independence Park/MAC Park- Field Seasons | |
|---|---|
Spring Season — March/April/May | Field Use Applications due by Feb. 1st Approvals sent Feb. 15th |
Summer Season — June/July/Aug | Field Use Applications due by May 1st Approvals sent May 15th |
Fall Season — Sept/Oct/Nov | Field Use Applications due by Aug. 1st Approvals sent Aug. 15th |
Winter Season — Dec/Jan/Feb | Field Use Applications due by Nov. 1st Approvals send Nov. 15th |
Diameter of Removed Trees at Breast Height in Inches | Tree Escrow Fund Contribution (Value for Each Tree to Be Removed and Not Replaced) |
|---|---|
Greater than 10 inches to 16 inches | $480 |
Greater than 16 inches up to 23 inches | $840 |
Greater than 23 inches up to 30 inches | $1,680 |
Greater than 30 inches | $2,100 |