A.
Schedule created; conformance required. Structures and improvements erected, constructed or altered within the Borough of Montvale shall be located on the lot, designated and constructed in conformity with the restrictions set forth in the Limiting Schedule of this chapter of the Borough of Montvale.
[Amended 7-13-1993 by Ord. No. 93-951]
B.
Requirements. Said schedule contains the requirements for the maximum height of structures, in feet and in stories; the minimum size of lots; the maximum number of families per lot or the maximum residential density expressed in dwelling units per acre; the maximum area covered by buildings, structures or improvements; the requirements for minimum depth of front yard setback lines; the requirements for mandatory open spaces such as side yards and rear yards; the requirements for minimum lot area and minimum lot width; the minimum floor area of the R-40, R-15 and R-10 Zones; and the maximum floor area ratio.
[Amended 8-9-1994 by Ord. No. 94-974]
C.
Limiting Schedule. The Limiting Schedule is included as an attachment to this chapter.
[Amended 8-9-1994 by Ord. No. 94-974]
D.
Limiting Schedule for Affordable Housing Districts for Second Fair Share Cycle. The Limiting Schedule for Affordable Housing Districts for Second Fair Share Cycle is included as an attachment to this chapter.
[Added 10-14-2003 by Ord. No. 2003-1207; amended 2-24-2004 by Ord. No. 2004-1216]
E.
Limiting Schedule for Affordable Housing Districts for Third Fair Share Cycle. The Limiting Schedule for Affordable Housing Districts for Third Fair Share Cycle is included as an attachment to this chapter.
[Added 12-14-2004 by Ord. No. 2004-1228; amended 9-13-2005 by Ord. No. 2005-1243]