A.
For every direct or indirect connection to the sanitary sewerage system of the Township or to any part thereof, the following capacity-rate trunk-connection charges are established at the following rates:
[Amended 2-14-2008 by Ord. No. 08-02; 5-2-2022 by Ord. No. 22-06; 6-6-2024 by Ord. No. 24-07]
(1)
Residential user: $4,766 for each single-family dwelling or unit.
(2)
All other users: $4,766 for each 300 gallons per day as determined by the Township on the basis of certain factors, including but not limited to the factors contained in N.J.S.A. 40:14A-8, N.J.A.C. 7:14A-23.3, the data and information made available to the Township, and the results of its investigation and on studies of meter readings.
(3)
Connection fee biennial review. The connection fee shall be reviewed every even-numbered year and shall be subject to upward revision in accordance with the factors contained in N.J.S.A. 40:14A-8, N.J.A.C. 7:14A-23.3, the data and information made available to the Township, and the results of its investigation and on studies of meter readings.
B.
The capacity-rate trunk-connection charge above specified shall be in addition to any annual sewer use charge, Code Enforcement sewer tie-in connection permit fee, Township street opening permit fee, direct trunk tap-in charge, all other such fees and any special inspection fees that may be required in unusual cases to absorb the cost of inspections over and above that required under any other ordinance and in addition to any municipal sewer assessment for sanitary collecting sewers that may be constructed as local improvements by the Township Council.
[Amended 5-2-2022 by Ord. No. 22-06]
C.
The capacity-rate trunk-connection charge above specified shall be paid to the Treasurer of the Township as follows:
(1)
On application for a building permit for new construction, the entire charge shall be paid in one lump sum.
(2)
On application to Code Enforcement Division for a sewer tie-in connection permit for a connection to an existing structure, at least 1/5 of the charge shall be paid at the time of such application, and the balance of the charge shall be payable in four equal annual installments, together with interest on the unpaid portions computed at the rate of 8% per annum with an option to pay such unpaid balance with interest to payment date at an accelerated date.
D.
For all uses other than a single-family dwelling, the capacity-rate trunk-connection charge for each individual connection shall always be subject to an upward revision in accordance with rates herein prescribed and then prevailing, when any enlargement of the connected structure or when any addition to the connected structure occurs or when any increase in the use of the connected structure occurs which increases the service demand upon the trunk lines and upon the capacity of the sanitary sewerage facilities of the Township. No such revision shall be made except after reasonable notice has been given to the user and an opportunity has been given to the user to be heard on the matter.
E.
The capacity-rate trunk-connection charge shall also be applicable to any connection made in any other municipality, where such connection would flow through the Middle Brook Trunk or North Branch Trunk.
[Added 5-2-2022 by Ord. No. 22-06]