[Adopted 3-4-2019 by Ord. No. 2019-02]
A. 
The permittee shall restore the surface of all streets, broken into or damaged as a result of excavation of work, to its original condition in accordance with the specifications of the Department of Public Works.
B. 
In the case of utility work undertaken by a public or private utility, which work involves placing new or replacing, or repairing of existing utility infrastructure, such as gas lines, water lines, electrical lines, and sewer lines, where the area to be trenched is greater than 50 linear feet, upon completion or within a reasonable amount of time as determined by the Borough Engineer, the permittee shall mill and repave the entire pavement surface from edge to edge, or curb to curb for the full length of the excavation in accordance with the specifications of the Department of Public Works.