[Ord. 6 S+FG, 11-5-1992 § 14:2A-17]
All plumbing leaks or any other existing violations or conditions that cause the peeling of paint or loosening of plaster shall be repaired before any surfaces are refinished or covered.
[Ord. 6 S+FG, 11-5-1992 § 14:2A-18]
Upon completion of repair and prior to repainting an inspection shall be made to determine if the hazard has been satisfactorily eliminated. All repairs may be finished with a suitable non-lead paint or other hard non-lead surface.