[Amended 8-24-2005 by Ord. No. 2005-12]
Industrial or commercial user(s) is defined as a user discharging other than a domestic pollutant as set forth in N.J.A.C. 7:14A-1.2. Any building used in whole or in part as a dwelling or which requires or uses sanitary sewage disposal, now or hereafter erected on any lot abutting a street in which a sanitary sewer line is now or hereafter constructed, shall be connected with such sewer line, and a toilet or toilets installed therein, within the appropriate following time period applicable to such building:
A.
Existing buildings: within 90 days after adoption of this chapter.
B.
New buildings: prior to occupancy thereof.
C.
Buildings on a street in which a sanitary sewer line is hereafter constructed: within 90 days after completion of the construction of such sewer line.
D.
Any newly constructed structure or existing structure that is expanded to include a new dwelling unit or commercial unit for which sewer service is required shall have a water meter installed prior to occupancy. The water meter shall separately monitor the water usage for each new dwelling unit and for each new commercial unit within a mixed-use structure.
[Added 7-20-2015 by Ord. No. 2015-11; amended 3-1-2021 by Ord. No. 2021-03; 8-16-2021 by Ord. No. 2021-09]