Obstructions or increases may only be permitted if amendments are made to this chapter, the official Floodplain Zoning Maps, floodway lines and water surface profiles, in accordance with §
477-30.
A. In AE Zones with a mapped floodway, no obstructions or increases shall be permitted unless the applicant receives a conditional letter of map revision from FEMA and amendments are made to this chapter, the Official Floodplain Zoning Maps, floodway lines and water surface profiles, in accordance with §
477-30. Any such alterations must be reviewed and approved by FEMA and the DNR.
B. In A Zones, increases equal to or greater than 1.0 foot may only be permitted if the applicant receives a conditional letter of map revision from FEMA and amendments are made to this chapter, the Official Floodplain Maps, floodway lines, and water surface profiles, in accordance with §
477-30.
The governing body shall change or supplement the floodplain zoning district boundaries and this chapter in the manner outlined in §
477-31 below. Actions which require an amendment to this chapter and/or submittal of a letter of map change (LOMC) include, but are not limited to, the following:
A. Any fill or floodway encroachment that obstructs flow causing any
increase in the regional flood height;
B. Any change to the floodplain boundaries and/or watercourse alterations
on the FIRM;
C. Any changes to any other officially adopted floodplain maps listed in §
477-5B(1);
D. Any floodplain fill which raises the elevation of the filled area
to a height at or above the flood protection elevation and is contiguous
to land lying outside the floodplain;
E. Correction of discrepancies between the water surface profiles and
floodplain maps;
F. Any upgrade to a floodplain zoning ordinance text required by § NR
116.05, Wis. Adm. Code, or otherwise required by law, or for changes
by the municipality; and
G. All channel relocations and changes to the maps to alter floodway
lines or to remove an area from the floodway or the floodfringe that
is based on a base flood elevation from a FIRM requires prior approval
by FEMA.