[R.O. 1997 § 545.010; Ord. No. 2839[1] §§ 1 — 2, 7-7-2009; Ord. No. 3053, 5-19-2020]
A person shall not disturb, excavate or cause a disturbance or excavation to be made in any roadway or right-of-way, without first obtaining a permit from the Street Commissioner. Should an excavation in an unimproved right-of-way require excavation in an intersecting roadway, an additional permit shall be obtained for a roadway excavation.
[1]
Editor's Note: This ordinance repealed Ch. 545, Excavations, of the 1997 Code, and enacted new provisions set out herein. Former Ch. 545 derived from CC 1929 Ch. 28, Art. 6 §§ 948 — 958; Ord. No. 658 §§ 2 — 3, 6-19-1956; Ord. No. 1642 § 1, 10-21-1975; Ord. No. 2739 § 1, 6-21-2005.