A.
No site plan shall be approved, no street shall be constructed, no changes shall be made in the contour of the land, and no grading, excavating or removal or destruction of topsoil, trees or other vegetative cover of the land shall be commenced by any developer until such time that a plan for soil erosion and sediment control has been processed and approved by the Borough Planning Board or there has been a determination by the Planning Board that such plans are not necessary. Soil erosion and sediment control plans are not required in the following instances:
(1)
Disturbances of 5,000 square feet or less of the surface area of the land;
(2)
Construction of structures for which a building permit would not be required under the Standard Building Code of the State of New Jersey;
(3)
Single-family dwellings which are not part of a subdivision; and
(4)
Agricultural use of land when operated in accordance with a conservation plan approved by the local Soil Conservation District, or when it is determined by the local Soil Conservation District that such agricultural pursuits will not cause excessive erosion and sedimentation.
B.
No subdivision, site plan or land development plan shall be approved unless:
(1)
There has been a plan approved by the Planning Board that provides for soil erosion and sediment control consistent with this section and an improvement bond (or other acceptable security) has been deposited with the Borough in the form of an escrow guarantee which will ensure installation and completion of the required improvements in accordance with Borough specifications; or
(2)
There has been a determination by the Borough Planning Board that a soil erosion and sediment control plan is not necessary.