[Adopted 2-16-1982; amended in its entirety 12-3-2018 by Ord. No. 2018-14]
The fee for a construction permit shall be the sum of the subcode fees listed in Subsection A(1) through (6) hereof and shall be paid before the permit is issued.
A. 
Building Subcode fee shall be:
(1) 
A minimum fee for the building subcode shall be $75.
(2) 
For new construction volume (cubic feet) multiplied by 0.050.
(3) 
For renovations, alterations and repair: $35 per $1,000 of estimated cost of work.
(4) 
For combinations of renovations and additions, the sum of the fees computed separately as renovations and additions.
(5) 
Flat fees.
(a) 
Tank removal: $75.
(b) 
Shed (less than 300 square feet): $75.
(c) 
Fireplace: $75.
(d) 
Pools:
[1] 
Above-ground: $75.
[2] 
In-ground: $120.
(e) 
Signs: $5 per square feet.
(f) 
Demolition:
[1] 
One-car garage: $70.
[2] 
Two-car garage: $100.
[3] 
One-family dwelling: $500.
[4] 
Two-family dwelling: $500.
[5] 
Multifamily dwelling: $1,000.
[6] 
Commercial building: $1,000.
(g) 
Tents: $92.
(h) 
Monitoring wells: $60 per well.
(6) 
Certificate of occupancy: fee is 10% of total permit costs.
B. 
Plumbing Subcode fee shall be:
(1) 
A minimum fee for the Plumbing Subcode shall be $75.
(2) 
The fee shall be in the amount of $25 per fixture, piece of equipment or appliance connected to the plumbing system, and for each appliance connected to the gas or oil piping system. For the purpose of computing this fee, fixtures shall include but not be limited to lavatories, kitchen sinks, slop sinks, urinals, water closets, bath tubs, shower stalls, laundry tubs, floor drains, drinking fountains, dishwashers, garbage disposals, hot water heaters, or similar devices.
(3) 
The fee shall be in the amount of $65 per special device. For the purpose of computing this fee, special devices shall include, but not be limited to, steam boilers, furnaces, A/C units, grease trap, interceptor/separator, water connection, sewer connection, sewer ejector, sewer pumps, backflow preventer, and tank installation.
C. 
Electrical Subcode fee shall be:
(1) 
A minimum fee for the Electrical Subcode shall be $75.
(2) 
For the purpose of computing fees, outlets or fixtures shall include, but not be limited to, lighting fixtures, switches, smoke or heat detectors, convenience receptacles, burglar alarms, intercom panels, thermostats, and motors and devices of less than one hp or one kw.
(a) 
From one to 25 receptacles or fixtures: $50.
(b) 
For each additional 25 receptacles or fixtures: $50.
(3) 
For the purpose of computing these fees, the term service panel, subpanel, feeder, switches, and switchboards:
(a) 
Up to 100 amps: $100.
(b) 
101 to 201 amps: $175.
(c) 
Each additional 100 amps: $50.
(4) 
For the purpose of computing these fees, all motors except those in plug-in appliances shall be counted, including control equipment, generators, transformers and all heating, cooking or other devices consuming or generating electrical current:
(a) 
Motors and electrical devices over:
[1] 
1 hp up to 5 hp: $50.
[2] 
6 hp up to 25 hp: $75.
[3] 
26 hp up to 100 hp: $100.
[4] 
For each increase of 50 hp: $25.
(b) 
Transformers and generators over:
[1] 
1 kw up to 5 kw: $50.
[2] 
6 kw up to 25 kw: $75.
[3] 
26 kw up to 100 kw: $100.
[4] 
For each increase of 50 kw: $25.
(5) 
The fees for pools, fountains and similar installations:
(a) 
Above-ground, includes bonding and motor: $100.
(b) 
In-ground, includes bonding and motor: $150.
(6) 
Light standards: $100.
D. 
Fire Subcode fee shall be:
(1) 
Hard wire interconnected smoke detectors (R3 and R5): $25 per unit.
(2) 
For fire sprinkler system, the fee shall be as follows:
(a) 
Specific number of heads:
[1] 
20 or fewer heads: $100.
[2] 
21 to 100 heads: $200.
[3] 
101 to 200 heads: $350.
[4] 
201 to 400 heads: $800.
[5] 
401 to 1,000 heads: $1,200.
[6] 
Over 1,000 heads: $1,500.
(b) 
In computing fees for heads and detectors, the number shall be counted separately and two fees, one for heads and one for detectors, shall be charged.
(3) 
Fire standpipe system: $267.
(4) 
Independent pre-engineer system: $250.
(5) 
Gas- or oil-fired appliance: $75.
(6) 
Kitchen exhaust system: $100.
(7) 
Incinerator system: $426.
(8) 
Crematorium system: $426.
(9) 
Smoke control system: $300.
E. 
CCO inspection fees. The following will be a per unit fee:
(1) 
$100 initial inspection.
(2) 
$80 re-inspection.
(3) 
$125 emergency inspection (less than 72 hours' notice).
F. 
Zoning fees.
(1) 
$125 residential.
(2) 
$200 commercial.
(3) 
$1,000 (annually) massage parlor.
(4) 
$2,000 (annually) tattoo parlor, body piercing establishment (excluding ear piercing) (proof of active current license).
(5) 
$1,000 (annually) microblading.
(6) 
$150 (annually) tanning salon.
G. 
Sewer connection fee: $1,800 per connection.
H. 
Penalties. Any person or persons who violate any provision of this section is subject to penalties of not more than $2,000.