1.
It shall be unlawful for any person to commence work for the erection or alteration of any building or for a change in land use until a zoning permit has been duly issued therefor. No such zoning permit shall be required in case of normal maintenance activities, minor repairs, and alterations which do not structurally change a building or structure. A zoning permit shall be required prior to any of the following actions:
A.
The erection, addition, or alteration of any building or portion thereof.
B.
The erection, addition, or alteration of any fence or accessory structure.
C.
The erection, addition, or alteration of a sign.
D.
The use or change of use of a building or land.
E.
The change or extension of a nonconforming use.
2.
Application for permits. All applications for a permit shall be made to the Zoning Officer on a form provided by the Borough Office and shall conform to the following requirements. A copy of all permit application materials shall be returned to the applicant when such plans have been reviewed and acted upon by the Zoning Officer.
A.
Name, address and telephone number of applicant.
B.
A note indicating what Zoning District(s) the property is located in.
C.
Scaled drawings in a digital format indicating:
1)
The actual shape and dimensions of the lot to be built upon.
2)
The exact size and location of any buildings existing on the lot.
3)
The required building setback lines, per applicable section of this chapter.
4)
The footprint and dimensions of any proposed building or structure, with its location on the lot accurately shown.
5)
The existence and intended use of each building or part of a building.
6)
The number of dwelling units the building is designed to accommodate.
D.
Name of the person, firm, corporation, or associations erecting building, structure or use, if different from the applicant.
E.
Written consent of the owner of the building, structure, or land to or on which the building, structure or use is to be located.
F.
Other information as required by the Zoning Officer to demonstrate full compliance with this chapter and all other codes and ordinances of the Borough of Mount Oliver.
G.
All applicable permits fees, as established by resolution by the Mount Oliver Borough Council, shall be paid.
3.
Issuance of permits. No permit shall be issued until the Zoning Officer has certified that the proposed use of land, building, addition, alteration, sign, or other design feature complies with all the applicable provisions of this chapter, as well as the provisions of all other applicable ordinances. A zoning permit issued in error shall become null and void.
4.
Time frame for Zoning Officer action. The Zoning Officer shall complete the review of the zoning permit application within 30 days of the receipt of a complete application.
5.
Permit validity. Unless construction shall have been commenced within one year of the permit issuance date, any permit issued hereunder shall become void 12 months after said issuance date.