[Ord. No. 3025, 8-7-2018]
All applicants shall participate in a pre-application meeting with the stormwater and planning departments to discuss potential approaches for stormwater design and opportunities to use design techniques to reduce runoff rates, volumes, and pollutant loads. During the pre-application meeting, the applicant shall provide information regarding design considerations.