A.
Jurisdiction. Pursuant to N.J.S.A. 40: 27-6.2a and N.J.S.A. 40:27-6.6e all land development which will cause stormwater to drain either directly or indirectly to a County road or through any drainageway, structure, pipe, culvert or facility for which the County is responsible for the construction, maintenance or proper functioning shall provide a stormwater management plan in accordance with the standards and criteria established in this chapter.
B.
Requirements.
(1)
Stormwater drainage improvements shall be required to provide sufficient design and capacity to satisfactorily accommodate the anticipated impact upon a County road or County-maintained drainage facility from the increased runoff created by any land development.
(2)
In the Pinelands area, the standards of N.J.A.C. 7:50-6, Part VIII, of the Comprehensive Management Plan for stormwater drainage improvements shall be met.