A.
The purpose of this article is to regulate sand and gravel and other quarrying operations, including the removal, processing and storage of topsoil or loam, rock, sand, gravel and other earth materials (hereinafter "mineral extraction"). The Planning Board shall follow the site plan review requirements in Article 8 when more than 25,000 square feet of gross area is to be developed, as defined in Article 3. (See definition of "development.")
B.
The removal of stone, sand and gravel from banks or quarries and the processing of said materials shall not be permitted without the approval of the Planning Board. The removal of loam, topsoil or sod is permitted in any of the Town's zoning districts. Such material may be hauled away to other locations, either inside or outside the Town of Windham. The Planning Board may approve the removal and processing of such materials after public hearing thereon, and a finding that such removal and processing will be performed subject to the conditions and safeguards set forth in this article.
C.
These regulations are intended to protect the quality and quantity of the groundwater and surface waters, to control erosion, to provide for the reclamation and rehabilitation of mineral extraction sites so that future uses shall be compatible with the surrounding neighborhood, and to minimize any adverse impact of such pit operations on adjacent and nearby properties.