[Amended 9-5-2006; Ord. No. 1571-2015; 5-9-2023 by Ord. No. 1710-23]
A.
Fee Schedule. Every application for development shall be accompanied by a check made payable to Hazlet Township in accordance with the following schedule:
1.
APPLICATION FEES.
Type of Application | Administrative Fee | |
|---|---|---|
Certification of Pre-existing Non-Conforming Use | $75 | |
Appeals and Interpretations | $275 | |
Special Meeting | $1,500 | |
Conceptual/Informal Review | $575 | |
Bulk Variances | Residential | $225 per variance |
Non-Residential | $275 per variance | |
Accessory Buildings and Structures Residential Only | $225 flat fee | |
Use Variances | Residential | $750 plus $50 per dwelling unit |
Non-Residential | $800 per acre of entire tract or $50 per 1,000 square feet gross floor area, whichever is greater | |
Conditional Use | $500 | |
Tree Removal Permit | Residential | New residential building lots, $15 per tree up to a maximum of $350 per lot. |
Non-Residential | $15 per tree up to maximum of $700 for EACH acre | |
Soil Removal Permit | $40 per permit | |
Subdivision | Minor | $350 |
Major | ||
Preliminary | $650 plus $50 per lot | |
Final | 50% of preliminary fee | |
Site Plan | Minor | |
Preliminary | $650 plus $50 per lot | |
Final | $50% of preliminary fee | |
Site Plan | Major | |
Preliminary | $1,000 plus $50 per acre, plus $0.05 per square foot of proposed building area | |
Final | 50% of preliminary fee | |
Requested Waivers | ||
Environmental Impact Study | $150 | |
Traffic Study | $150 | |
Drainage/Storm Water | $150 | |
Exempt from Site Plan | $150 | |
Design (i.e. parking space size) | $100 | |
All others not included above | $100 | |
Tax Map Revision Fee | $75 per lot for minor and major subdivisions to cover the cost to revise tax map | |
Re-submission or Revision Fee | $50 or 40% of original fee, whichever is greater | |
Certified List per MLUL | $10 or $0.25 per name whichever is greater | |
Extension of Approvals | $300 | |
2.
ESCROW FEES.
Type of Application | Fee | |
|---|---|---|
Appeals and Interpretations | $500 | |
Conceptual/Informal Review | $575 | |
Bulk Variances | Residential | $600 |
Non-Residential | $500 plus $100 per each variance requested | |
Use Variance | $1,500 | |
Conditional Use | $1,000 | |
Subdivision | Minor | $1,500 |
Residential/Preliminary | ||
1 - 5 unit(s) and/or lot(s) | $2,000 | |
6 - 25 unit(s) and/or lot(s) | $3,500 | |
25 - 100 unit(s) and/or lot(s) | $5,000 | |
101 plus unit(s) and/or lot(s) | $7,500 | |
Residential/Final | 50% of preliminary fee | |
Site Plan | Minor | $500 |
Preliminary | $2,000 plus $25 per dwelling unit | |
Final | 50% of preliminary fee | |
Major | ||
Commercial/Industrial/Preliminary | ||
0 - 1,250 square feet | $1,500 | |
1,251 - 10,000 square feet | $2,500 | |
10,001 - 25,000 square feet | $5,000 | |
25,001 - 75,000 square feet | $7,500 | |
Plus 75,000 square feet | $10,000 | |
Final | 50% of preliminary fee | |
Special Meeting | $500 | |
Resubmission or Revision | $50 or 40% of original fee whichever is greater | |
Tree Removal Permit | refer to 181-523 escrow | |
Extension of Approval | $1,000 | |
Soil Removal | $100 for review and inspection by Twp. Engineer, plus $0.05 per square foot of area disturbed due to removal | |
3.
MISCELLANEOUS FEES.
Type of Application | Administrative Fee | |
|---|---|---|
Change of Zone Request | $250 | |
Zoning Permits | ||
New Residential Single-Family Dwelling | $150 each unit | |
New Non-Residential Construction | $250 for the 1st $25,000 of construction cost or any part thereof plus $5 for each $1,000 of construction cost thereafter | |
Renovations: | ||
Residential | ||
Application Review Fee: | $25 Non-Refundable | |
Permit Fee: | $10 for the 1st $1,000 of construction cost and $5 per $1,000 thereafter; Minimum fee: $25 | |
Non-Residential (Non-refundable) | ||
Application Review Fee: | $75 | |
Permit Fee: | $10 for the 1st $1,000 of construction cost and $5 per $1,000 thereafter; Minimum fee: $25 | |
Fence | $50 flat fee | |
Retaining Wall | $50 flat fee | |
Shed | $50 flat fee | |
Signs | $1 per square foot, with minimum $25, plus application fee $75 | |
Non-Residential Use Permit/Occupancy | ||
Tenant change | $100 | |
Ownership change | $250 | |
Lot Grading and Drainage Plan | ||
Initial review by Twp. Engineer | $200 per lot | |
Revised review by Engineer | $100 per lot | |
Final As-built Survey, includes 1 inspection by Twp. Engineer | $250 | |
Revised Final As-Built | $100 | |
Re-inspect of site and report preparation | $150 | |
DRO Book | $75 | |
Colored Zoning Map | (11" x 17") | $5 |
(2'x3') | $20 | |
Photocopies | State Statue | |
No charge for records sent email or fax | ||
Copying data to disk or CD | $0 | |
Use of Tape for Transcript Purposes (Must supply their own stenographer to make transcript) | $0 | |
Duplication of Tape Recordings | $0 | |
Certificate of Occupancy [Refer to Chapter 170 of Hazlet Codes] | ||
B.
Purpose of Fee. The application charge is a flat fee to cover direct administrative expenses and is non-refundable. The escrow account is established to cover the costs of professional services including engineering, legal, planning and other expenses connected with the review of the submitted materials. In accordance with N.J.S.A. 40:55D-53 and N.J.S.A. 40:55D-53.1, sums not utilized in the review process shall be returned to the applicant upon written request. If additional sums are deemed necessary, the applicant shall be notified by certified mail or personal service of the required additional amount and shall add such sum to the escrow. Payment shall be due from the applicant within fifteen (15) days of receipt of the notice. If payment is not received within fifteen (15) days, the applicant shall be considered to be in default, and such default may be grounds for denial of the application.
C.
More than one Request. Where one (1) application for development includes several approval requests, the sum of the individual required fees shall be paid.
D.
Costs of Review and Inspection. Each applicant for subdivision or site plan approval shall agree in writing to pay all reasonable costs for professional review of the application, including costs incurred with any informal review of a concept plan which may have preceded the submission of a preliminary application. Additionally, each applicant shall agree in writing to pay all reasonable costs for the municipal inspection of the constructed improvements. All such costs for review and inspection must be paid before any construction permit is issued and all remaining costs must be paid in full before any occupancy issued or bonding is released.
E.
Court Reporter. If an applicant desires a court reporter, the cost of taking testimony and transcribing it and providing a copy of the transcript to the municipality shall be at the expense of the applicant who shall arrange for the reporter’s attendance. The municipality provides for the tape recording of the proceedings before the Board.
F.
Waiver of Fees for Affordable Housing. Notwithstanding any other provision of this Ordinance, a waiver of all municipal subdivision and site plan escrow fees, zoning permit, construction permit and certificate of occupancy fees shall be granted by the approving municipal agency for all housing units being provided by the applicant for low and moderate income families. If an applicant desires a court reporter, the cost of taking testimony and transcribing it and providing a copy of the transcript to the municipality shall be at the expense of the applicant who shall arrange for the reporter’s attendance. The municipality provides for the tape recording of the proceedings before the Board.