A. 
Water and sewer charges necessary. It is hereby found and determined that a necessity exists for determining an equitable method for apportioning the costs of the installation of a water main, sanitary main and lateral within Abbey Road between Commerce Road (northerly junction) and 2,000 feet northwest of East Avenue for future hookups by parcels and which are not currently within the corporate limits of the City but may, in the future, become a part of the City.
B. 
North Abbey Road zone charges. As a result, the City of Onalaska does hereby establish the following North Abbey Road zone charges for all such lands:
1. 
Water and sewer hookup charges: $7,663 per hookup.
2. 
Street improvement fee: $2,616 per hookup.
C. 
The charges shall be paid by the owner at the time said lands are annexed to the City; provided, however that the charges for all new parcels shall be paid at the time such parcel(s) is created.
D. 
The North Abbey Road zone consists of those lands designated on the map that is designated as Appendix B of this section and which is incorporated herein and is on file in the office of the City Engineer.
E. 
Hereafter, the charges shall increase on an annual basis by the amount of the increase in the Consumer Price Index (CPI).
A. 
Water and sewer charges necessary. It is hereby found and determined that a necessity exists for determining an equitable method for apportioning the costs of the installation of a water main, sanitary main and lateral within Crestwood Lane for future hookups by parcels and which are not currently within the corporate limits of the City but may, in the future, become a part of the City.
B. 
Crestwood Land zone charges. As a result, the City of Onalaska does hereby establish the following Crestwood Land zone charges for all such lands:
1. 
Water and sewer hookup charges: $7,250 per hookup.
2. 
Street improvement fee: $2,176 per hookup.
C. 
The charges shall be paid by the owner at the time said lands are annexed to the City; provided, however that the charges for all new parcels shall be paid at the time such parcel(s) is created.
D. 
The Crestwood Lane zone consists of those lands designated on the map that is designated as Appendix B of this section and which is incorporated herein and is on file in the office of the City Engineer.
E. 
Hereafter, the charges shall increase on an annual basis by the amount of the increase in the Consumer Price Index (CPI).
A. 
Water charges necessary. It is hereby found and determined that a necessity exists for determining an equitable method for apportioning the costs of the installation of a booster station for water in lands which may be developed in the French Road, Crestwood Lane and State Highway 16 areas, having a USGS elevation of 790 to 930, and some of which are not currently within the corporate limits of the City but may, in the future, become a part of the City. As a result, the City of Onalaska does hereby establish the following booster station charges for all such lands:
1. 
French Road/Crestwood Lane/State Highway 16 area booster station charges:
Parcel Size
Booster Station
New parcels < 1 acre
$2,266
New parcels > 1 acre
$2,266/acre
Existing parcels < 5 acres
$2,266
Existing parcels > 5 acres
*See below
*
If the parcel cannot be subdivided, the booster station charge shall be $2,266 for the entire parcel. If the parcel can be subdivided, the booster station charge shall be $2,266 for each parcel resulting from such subdivision.
B. 
The charges shall be paid by the owner at the time said lands are annexed to the City; provided, however that the charges for all new parcels shall be paid at the time such parcel(s) is created.
C. 
The French Road/Crestwood Lane water system high-pressure zone consists of those lands designated on the map that is designated as Appendix A of this section and which is incorporated herein and is on file in the office of the City Engineer.
D. 
As of January 1, 2021, the charges set forth herein shall increase. The amount of such increase shall be the amount by which the Consumer Price Index (CPI) has increased since January 1, 2020. Thereafter, the charges shall increase on an annual basis by the amount of the increase in the Consumer Price Index (CPI).
A. 
Charges necessary. It is hereby found and determined that a necessity exists for determining an equitable method for apportioning the costs of the installation of a booster station and necessary transmission lines for water in lands which may be developed in Greens Coulee, having a USGS elevation of 790 to 930, and which are not currently within the corporate limits of the City but may, in the future, become a part of the City. As a result, the City of Onalaska does hereby establish the following booster station/transmission charges for all such lands:
Parcel Size
Booster Station
Transmission Charge
New parcels < 1 acre
$1,000
$500
New parcels > 1 acre
$1,000/acre
$500/acre
Existing parcels < 5 acres
$1,000
$500
Existing parcels > 5 acres
*See below
*See below
*
If the parcel cannot be subdivided, the booster station charge shall be $1,000 and the transmission charge shall be $500 for the entire parcel. If the parcel can be subdivided, the booster station charge shall be $1,000 and the transmission charge shall be $500 for each parcel resulting from such subdivision.
B. 
The charges shall be paid by the owner at the time said lands are annexed to the City; provided, however that the charges for all new parcels shall be paid at the time such parcel(s) is created.
C. 
The Greens Coulee water system high-pressure zone consists of those lands designated on the map that is designated as Appendix A of this section and which is incorporated herein and is on file in the office of the City Engineer.
D. 
As of January 1, 2001, the charges set forth herein shall increase. The amount of such increase shall be the amount by which the Consumer Price Index (CPI) has increased since January 1, 2000. Thereafter, the charges shall increase on an annual basis by the amount of the increase in the Consumer Price Index (CPI).