[Ord. No. 4-2005, 8/9/2005]
1.
Copies of this chapter shall be available for use by any person seeking information concerning land development and/or subdivision standards and procedures in effect within the Township. Any prospective developer or subdivider may meet with the Township Planning Commission and/or the Township Engineer to discuss and review tentative plans and/or any provisions of this chapter. Should the developer wish to confer with the Township Engineer, a Township representative shall be present, and the costs for such conference shall be paid by the developer.
2.
The prospective developer must comply with the planning requirements of the Pennsylvania Sewage Facilities Act,[1] as administered by the Pennsylvania Department of Environmental Protection. Any planning modules required by that Act shall be completed and submitted at the time the sketch plan is submitted. It is suggested that the prospective developer consult the Township Sewage Enforcement Officer or the Wilkes-Barre regional office of the Pennsylvania Department of Environmental Protection as to the requirements of that Act.
[1]
Editor's Note: See 35 P.S. § 750.1 et seq.
3.
Prospective developers shall consult the County Conservation District representatives concerning erosion and sediment control and the effect of geologic conditions on the proposed development. At the same time, a determination should be made as to whether or not any flood hazards either exist or will be created as a result of the subdivision or development. Land that is subject to flooding shall not be platted for residential occupancy or for any other use that may endanger health, life or property. Such land within a subdivision shall be set aside for such uses as shall not be endangered by periodic or occasional flooding and shall not produce unsatisfactory living conditions.