A.
Except as provided in Subsection B of this section, every owner of a parcel of land within the Village shall install, at owner's expense, and maintain suitable plumbing facilities and connect to Village owned water main within 90 days after the date of written notice by the Village Board.
B.
A private well operation permit shall be maintained for all private wells in the Village. Failure to maintain a current private well operation permit may result in the mandatory abandonment of the private well within 90 days of written notice by the Village Board. No connection shall be made between the private well and the Village potable water system whatsoever.