A.
Zoning permit required.
(1)
Any structure lawfully constructed before approval of these regulations may be maintained in the same size, material, manner, location, and construction. Routine repairs to replace damaged or worn-out portions may be performed without requiring a Town zoning permit. Any changes to material, size, dimension, manner, construction, or location require a Town zoning permit as new construction. Repair/replacement of existing structures does not indemnify the owner from encroachments on adjacent properties, or requirements for any state or county permits.
[Added 8-14-2023 by Ord. No. 2023-002[1]]
[1]
Editor's Note: This ordinance also redesignated former Subsection A(1) through A(3) as Subsection A(2) through A(4), respectively.
(2)
A zoning permit certifies that an application complies with this chapter. Before an individual does any of the following, he or she must obtain a zoning permit: erect a building or structure, or enlarge, move, add to, or structurally alter a building, or excavate for a building or structure, or initiate any development activities pursuant to an approved site plan or subdivision plat.
(3)
The Planning Commission shall issue zoning permits for approved Category 1 site plans (plans for commercial, multifamily residential and institutional developments, for example) and major subdivision plats.
(4)
The Planning Commission shall issue zoning permits for approved Category 2 site plans (plans for single-family homes and additions, for example) and minor subdivision plats unless it has delegated such authority to the Zoning Administrator through its adoption of its written rules of procedure.
B.
Expiration of zoning permit.
[Amended 8-14-2023 by Ord. No. 2023-002]
(1)
A zoning permit shall automatically expire one year from the date of its issuance if no work described in the permit has begun, or if such work has been suspended or abandoned. The Zoning Administrator shall cancel the permit and provide written notice thereof to the persons affected.
(2)
If work described in any zoning permit has not been substantially completed within two years of the date of issuance, unless work is satisfactorily proceeding thereon, the Zoning Administrator shall cancel the permit and provide written notice thereof to the persons affected.
(3)
If work described in any zoning permit has not been substantially completed within one year, due to just cause, the Town's Zoning Administrator is authorized to grant, in writing, one extension for a time period of not more than one year, subject to payment of the zoning application fee. An extension shall be requested, in writing, with justifiable cause demonstrated.
(4)
No work on a cancelled permit may proceed unless and until a new zoning permit and a zoning permit fee has been issued.
C.
Occupancy permits for new, altered, or nonconforming uses.
(1)
It shall be unlawful to use or occupy or permit the use or occupancy of any building or premises, or both, or part thereof hereafter created, erected, changed, converted, or wholly or partly altered or enlarged in its use or structure until an occupancy permit shall have been signed by the Zoning Administrator and issued by the County Permits and Inspections Division, stating that the proposed use of the building or land conforms to the requirements of this chapter.
[Amended 5-22-2023 by Ord. No. 2023-003]
(2)
No nonconforming structure or use shall be renewed, changed, or extended until the Zoning Administrator shall have issued an occupancy permit. The occupancy permit shall state specifically wherein the nonconforming use differs from the provisions of this chapter.
[Amended 5-22-2023 by Ord. No. 2023-003]
(3)
An applicant for an occupancy permit involving a change of use of a building shall first submit the application to the Cecil County government for review and comment and then to the Zoning Administrator for permit review.
(4)
A temporary occupancy permit may be issued for a period not exceeding six months during alterations or partial occupancy of a building pending its completion, provided that such temporary permit may require such conditions and safeguards as will protect the safety of the occupants and the public.
(5)
As-built site plans. Two copies of the as-built site plan certified by an engineer shall be submitted to the Zoning Administrator prior to issuance of an occupancy permit for any building shown on a Category 1 site plan.
[Amended 5-22-2023 by Ord. No. 2023-003]
(6)
The Zoning Administrator shall maintain a record of all occupancy permits and copies shall be furnished upon request to any person.
[Amended 5-22-2023 by Ord. No. 2023-003]
D.
Construction and use to be as provided in applications, plans, certificates, and permits.
(1)
Zoning permits and occupancy permits authorize only that which is set forth on approved plans and applications, and no other use, arrangement, or construction.
[Amended 5-22-2023 by Ord. No. 2023-003]
(2)
Use, arrangement, or construction differing with that authorized shall be deemed a violation of this chapter.