A. 
All costs and expense incident to the installation and connection of the building sewer shall be borne by the owner only after the approval of the Town. Owner shall indemnify the Town from any loss or damage that may directly or indirectly be occasioned by the installation of the building sewer. Only licensed contractors approved by Town shall be permitted to do installations. Connection and allocation fees shall be paid at the time of zoning approval. The ready-to-serve charge will begin when the service is available for use.
B. 
After the initial connection from the public sewer has been made and through time and deterioration the building sewer has to be replaced as determined by the Town, the Town will replace the building sewer from the main to the property line at the Town's expense. The owner shall be responsible for all costs from the property line to the building drain.
A separate and independent building sewer shall be provided for every commercial and dwelling unit, except that where one building stands at the rear of another on an interior lot and no private sewer is available or can be constructed to the rear building through an adjoining alley, court, yard or driveway, the building sewer from the front building may be extended to the rear building and the whole considered as one building sewer. In all cases, the appropriate connection fee for the total number of units served shall be levied.
Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor. No building sewer shall be laid parallel to or within three feet of any bearing wall, which might thereby be weakened. The depth shall be sufficient to afford protection from frost. The building sewer shall be laid at uniform grade and in straight alignment.
In all buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried by such drain shall be lifted by approved artificial means and discharged to the building sewer.
All excavations for building sewer installations shall be adequately guarded with barricades and lights so as to protect the public from hazard. Streets, sidewalks, parkways and other public property disturbed in the course of the work shall be restored in a manner satisfactory to the Town.
The applicant for the sewer permit shall notify the Superintendent when the building sewer is ready for inspection and connection to the public sewer. The connection shall be made under the supervision of the Superintendent or his/her representative and shall be constructed in accordance with this chapter.