A.
All costs and expense incident to the installation and connection of the building sewer shall be borne by the owner only after the approval of the Town. Owner shall indemnify the Town from any loss or damage that may directly or indirectly be occasioned by the installation of the building sewer. Only licensed contractors approved by Town shall be permitted to do installations. Connection and allocation fees shall be paid at the time of zoning approval. The ready-to-serve charge will begin when the service is available for use.
B.
After the initial connection from the public sewer has been made and through time and deterioration the building sewer has to be replaced as determined by the Town, the Town will replace the building sewer from the main to the property line at the Town's expense. The owner shall be responsible for all costs from the property line to the building drain.