In all zones for proposed uses, subdivision, site development or construction other than an exempt development, site plan and/or subdivision approval shall be required prior to:
A.
Subdivision or resubdivision of land.
[Amended 4-9-1990 by Ord. No. 607]
B.
Issuance of a zoning permit or building permit.
[Amended 8-18-2003 by Ord. No. 811]
C.
Commencement of any regulated use or activity, which includes:
[Amended 4-9-1990 by Ord. No. 607]
(1)
The erection or construction of new buildings or structures.
(2)
Any alteration, repair or remodeling which increases the lot coverage or requires a variance, waiver or interpretation of this chapter.
(3)
The use or occupancy of any building, structure or land.
(4)
Any activity which entails the construction of any improvements or the alteration of the natural condition of any land.
(5)
The conversion of a building or structure to a different use in accordance with § 94-2.3, Terms defined, "change in use."
(6)
Demolition or removal of any historic structure or any building or structure within an Historic District.