[Ord. No. 509, 8-11-2021; Ord. No. 544, 6-21-2023]
A. Application for building permits shall be completed and signed by the contractor for the project, and the individual(s) owning the property and for whom the structure is to be built. Physical location address or lot, block, and addition number shall be identified with the subdivision.
B. The following information and data is to be submitted to the Administrative Officer for new construction:
1. A survey or verification of a previous survey, by a professional engineer or registered land surveyor integrated with the plot plan of the lot showing adjacent property, names of streets, and existing utility facilities at a scale of one (1) inch to ten (10) feet. Location and size of the proposed structure shall be at the discretion of the owner and shall be indicated with respect to front, side, and rear setbacks on the integrated surveyed plot plan in compliance with dimensional requirements as set forth in Section 400.518 of this Chapter.
a. The removal of a survey pin or monument, without replacement under the supervision of a professional engineer or registered land surveyor, is prohibited and subject to penalties, as set forth in Section 400.350 of this Chapter.
2. A plan that includes:
a. Proposed grading and excavation, see Section 400.620.
b. Proposed water service to the building.
c. Electric service to the building.
d. Sanitary system or sewer service line to the building.
e. Location of driveways and location and size of culvert(s), if engineering drawings are required, costs will be at the contractor's/owner's expense.
C. The following information and data is to be submitted to the Administrative Officer for remodel/repair/alterations/demolition:
1. Building permit application detailing the complete scope of work to be done.
2. Drawings showing changes in design, square footage, and location of work on property.
a. The sizing of culverts shall be based on terrain and all other applicable circumstances. Driveways with a seven percent (7%) grade or greater may be required to install one (1) of the following:
(1) Polyethylene smooth bore pipe — twelve (12) inch inside diameter.
(2) Corrugated steel pipe — fifteen (15) inch inside diameter.
(3) Grated steel pipe — minimum two (2) inch grate and fifteen (15) inch inside diameter.
(4) All residential properties requiring a culvert must install a minimum of twenty (20) feet per entrance or exit.
(5) All commercial properties requiring a culvert must install a minimum of forty (40) feet per entrance or exit.
b. Stormwater Control. In addition to all applicable building codes, and prior to the final occupancy permit, the condition, surface material, grade, and stormwater drainage provisions of said construction must be inspected and approved. No grading, driveway, parking lot, or access way shall alter the surface water in such a way to potentially, detrimentally affect neighboring lands, streets, or rights-of-way. Said inspection shall be called for prior to the final surface improvements and must be approved as to grade and sufficient surface water management prior to gravel, concrete, asphalt or other initial grade materials applied. Failure to do so shall result in the withholding of the final occupancy permit and such other requirements or modifications as the Public Works Director or his/her assignee deem necessary to adequately control surface water runoff.
c. Driveway.
(1) All new driveways must have a permit and a street bond, as specified in Resolution 489, available in the City Clerk's office.
d. Location Of Septic Tank And Lateral Field.
(1) Septic tank and lateral field shall be properly located and indicated to scale. Septic tanks shall be concrete aerated system or other Class 1 approved tanks size one thousand (1,000) to one thousand five hundred (1,500) gallons' capacity depending upon the number of bedrooms.
(2) Lateral fields shall be one hundred twenty (120) feet of lateral line per bedroom and a minimum of three hundred (300) feet of lateral line for the system.
(3) Special circumstances may be taken into consideration for septic systems approved by the Department of Natural Resources and/or the Stone County Health Department by making an application to the City Building Official.
e. Verification of the building footing shall be made by the City Building Inspector and may require the aid of a surveyor; costs are at contractor's/owner's expense. The final responsibility for the placement of the building according to the City Code will be that of the contractor/owner.
f. Off-street parking in accordance with Section 400.610.
3. Detailed construction drawings showing:
a. Floor Plan. Verify that floor plans meet the deed, subdivision, or City living area space requirements for the specific zoning district.
c. Plumbing and electrical layouts.
4. Detailed demolition plans showing:
a. Complete removal of structure and foundation to a licensed landfill.
b. Backfill plan where foundation is removed.
c. Removal plan of all utilities to origin of private service.
d. Sewer line removal plan: Sewer line to be removed to proximity of property line and sealed with concrete or other approved material, unless otherwise specified by authority of Building Official.
e. Water line removal plan: Water line shall be capped immediately after the stop box. Any other location must be approved by a Building Official.
f. Debris removal plan: All debris surrounding the structure shall be removed with structural debris and foundation. Contractors must use the City-contracted waste removal company for roll off dumpsters. If using dump trucks, no roll offs are required.
5. Copy of receipt showing all currently payable delinquent taxes have been satisfied.
6. If the building is to be used for a business of any kind, verify that the type of business is permissible according to this Title.
7. If a sign is to be installed, verify that the type, size, and location is permitted by Chapter
430 of this Code.
8. Any other information which the City Clerk may deem necessary for consideration in enforcing the provisions of this or any other ordinance of this City.
D. The permit fee, according to Section 400.343(D), will be issued within fifteen (15) working days after receipt of the completed required data and information listed above. No work on the site, other than clearing of trees and brush shall be performed until the permit has been issued and the fee paid.
E. If the building permit is denied on the basis of this Chapter, the applicant may appeal the action of the Administrative Officer to the Board of Adjustment.