Each applicant desiring to undertake a regulated activity subject
to this chapter shall submit to the Building Inspector a fee required
by the following fee schedule:
A. Simplified plan checklists: a fee in an amount as established by
the current Village Fee Schedule.
[Amended at time of adoption of Code (see Ch. 1, General
Provisions, Art. III)]
B. Sites larger than 20,000 square feet (minimum) in area and two acres
or less (maximum) in area: a fee in an amount as established by the
current Village Fee Schedule.
[Amended at time of adoption of Code (see Ch. 1, General
Provisions, Art. III)]
C. Sites larger than two acres (minimum) in area and five acres or less
(maximum) in area: a fee in an amount as established by the current
Village Fee Schedule.
[Amended at time of adoption of Code (see Ch. 1, General
Provisions, Art. III)]
D. Sites larger than five acres in area. The applicant shall be responsible
for paying a fee equal to the actual cost to the Village for all engineering
work and inspections incurred by the Village in connection with review
of the erosion control plan and inspections of the implementation
of the plan. At the time the application is submitted, the applicant
shall prepay an estimated fee of $500. Following review of the plan,
the Village Engineer shall estimate the total cost of the Engineer's
review and inspections in connection with the review and implementation
of the plan. If the amount is estimated to be more than the $500 deposited
with the application, the Building Inspector shall require the applicant
to deposit with the Village Treasurer, in escrow, the remaining sum
required by the Village Engineer's estimate.
[Amended at time of adoption of Code (see Ch. 1, General
Provisions, Art. III)]
Each applicant desiring an activity regulated by Article
II of this chapter shall submit to the Building Inspector a fee required by the following schedule:
A. Stormwater management plan without detention plan: a fee in an amount
as established by the current Village Fee Schedule.
B. Stormwater management plan with detention plan: a fee in an amount
as established by the current Village Fee Schedule.
The Village Treasurer shall pay bills submitted for engineering and inspection out of the funds escrowed under §
208-25D. In the event the amount deposited with the Village Treasurer falls below 25% of the amount required to be deposited, the Building Inspector shall require the permittee to replenish the escrow to the original amount required hereunder. Upon final acceptance of implementation of the erosion control plan, the amounts remaining in the escrow shall be refunded to the applicant. An accounting of all fees paid by the Village and the status of the escrow shall be provided to the permittee at least quarterly. In the event the applicant or permittee defaults in establishing or replenishing the escrow, the Village may take enforcement action as contemplated under §
208-9.