No person shall commence or continue with the construction,
installation, or operation of facilities within the city except as
provided by the ordinances of the city and the directives of the city
council. All construction activity in the city will be in accordance
with this article.
(Ordinance 1999-33-0060, sec. 1,
adopted 12/13/99)
(a) Permit
applications are required for construction or installation of new,
replacement or upgraded facilities in the city, whether aerial or
underground, except as provided herein. The permit will be in the
name of the person who will own the facilities to be constructed.
The permit must be completed and signed by a representative of the
owner of the facilities to be constructed. No permit is required by
the utility companies when bringing service drops from the service
line to the service location.
(1) Emergency responses related to existing facilities may be undertaken
without first obtaining a permit; however, the city should be notified
in writing within two (2) business days of any construction related
to an emergency response, including a reasonably detailed description
of the work performed in the city and an updated map of any facilities
that were relocated, if applicable.
(2) The phrase "construction or installation of new, replacement or upgraded
facilities" does not include repair or maintenance of existing facilities
unless such repair or maintenance requires the following: the breaking
of pavement, the closure of a nonresidential traffic lane, the installation
of facilities necessary to initiate service to a customer's property,
excavation or boring.
(b) The
permit shall state to whom it is issued, location of work, location
of facilities, dates and time work is to take place and any other
conditions set out by the mayor or his/her designee.
(c) The
person requesting a permit will provide the mayor or his/her designee
with documentation describing:
(1) The proposed approximate location and route of all facilities to
be constructed or installed and the applicant's plan for construction.
(2) Engineering is on a scale with a north arrow.
(3) Detail of the location which the applicant plans to use.
(4) Detail of all existing city utilities in relationship to the applicant's
proposed route.
(5) Detail of what the applicant proposes to install, such as number
of interducts, valves, etc.
(6) Details of plans to remove and replace asphalt or concrete in streets
(include city standard construction details for pavement patching
types A and/or B).
(7) The drawing shall the show the exact distance from the property line
of current survey of properties affected, both public and private.
(8) The drawing shall show all streets on and/or touching all properties
affected.
(9) The drawing shall show all buildings within 500 feet of placement
of the subject line.
(10) A drawing of any bores, trenches, handholes, manholes, switch gear,
transformers, pedestals, etc., including depth.
(11) Handhole and/or manhole typical of type of manholes and/or handholes
the applicant plans to use or access.
(12) Complete legend of drawings submitted by the applicant.
(13) The name, address, and phone numbers of the contractor or subcontractor
who will perform the actual construction, including the name and telephone
number of an individual with the contractor who will be available
at all times during construction. Such information, if known, shall
be required prior to the commencement of any work.
(14) The construction and installation methods to be employed for the
protection of existing structures, fixtures, and facilities within
or adjacent to the right-of-way, and the dates and times work will
occur, all of which (methods, dates, times, etc.) are subject to approval
of the mayor or his/her designee.
(15) A statement that the requirements of this article are met.
(16) The drawing shall show the total number of square feet incorporated
into easements whenever not on public land.
(17) The drawing shall show all existing subject lines and easements on
affected private properties and the square footage of existing lines.
(18) The drawing shall show the exact location of roads and/or rights-of-way
and/or easements to be created to service subject lines and square
footage to be utilized doing so.
(19) The permit shall state what will be transported.
(20) The permit shall state under what maximum pressure the fluid/gas
will be transported at.
(d) All
construction and installation in the city shall be in accordance with
the permit for the facilities. The mayor or his/her designee shall
be provided access to the work and to such further information as
he or she may reasonably require to ensure compliance with the permit.
(e) A
copy of the construction permit and approved engineering plans shall
be maintained at the construction site and made available for inspection
by the mayor or his/her designee at all times when construction or
installation work is occurring.
(f) All
construction or installation work authorized by the permit must be
started within six months of the date permitted or the permit will
have to be reconsidered by an authorized agent of the city. Construction
must be completed in within 90 days of the start of the project phase.
If the work cannot be completed in the specified time periods, the
permittee may request an extension from an authorized city agent.
The agent will use his/her best effort to approve or disapprove a
request for permit as soon as possible.
(g) A
copy of any permit or approval issued by federal or state authorities
for work in federal or state right-of-way located in the city shall
be provided, if requested by the mayor or his/her designee.
(h) A
request for a permit must be submitted at least five (5) working days
before the proposed commencement of work in the request, unless waived
by the mayor or his/her designee. Permit requests for large projects
may require additional review time.
(i) Requests
for permits will be approved or disapproved by the mayor or his/her
designee within a reasonable time of receiving all the information.
The mayor or his/her designee will use his/her best efforts to will
use [sic] to approve or disapprove a request for permit as soon as
possible.
(j) The
mayor or the applicant can request a pre-construction meeting with
the permittee and their construction contractor.
(k) Permittees
are required to contact Dig Test to determine where any existing lines
are on the property, and have them properly marked before any work
may begin.
(Ordinance 1999-33-0060, sec. 1(I),
adopted 12/13/99)
(a) The
city must be notified twenty-four (24) hours in advance that construction
is ready to proceed by either the facility owner, their contractor
or representative. At the time of notification, the right-of-way user
will inform the city of the number (or other information) assigned
from the one-call system.
(b) All
construction shall be in conformance with all city codes and standard
details for construction and applicable local and federal laws. Backfilling
shall meet or exceed federal Department of Transportation requirements.
(c) Erosion
control measures (e.g., silt fence) and advance warning signs, markers,
cones and barricades must be in place before work begins, if applicable.
(d) Barricades
and signage shall be installed in accordance with the Texas Manual
of Uniform Traffic Control Devices.
(e) Permittees
are responsible for the workmanship and any damages by its contractor
or subcontractors. Permittees are responsible for maintaining job
site and roadway cleanliness. A responsible representative of the
permittee will be available to the city at all times during construction.
(f) The
permittee shall comply with city, state and federal guidelines applicable
to the permittee.
(g) The
permittee, contractor, or subcontractor will notify the city immediately
of any damages to other utilities, either city or privately owned.
(h) It
is the city's policy not to cut streets or sidewalks; however, when
a street or sidewalk cut is required, prior approval must be obtained
from the city and all requirements of the city shall be followed.
Repair of all streets and sidewalk removals must be made promptly
to avoid safety hazards to vehicle and pedestrian traffic.
(i) Installation
of facilities must not interfere with city utilities, in particular
gravity dependent facilities.
(j) New
facilities must be installed to a depth in conformance with applicable
state and federal guidelines. In the absence of state and federal
guidelines, new facilities shall be installed to a depth approved
by the city.
(1) All buried lines carrying electricity or telecommunications shall
be a minimum of 18 (eighteen) inches in depth.
(2) All lines carrying water shall be a minimum of 18 (eighteen) inches
on public and 12 (twelve) inches on private property.
(3) All lines with pressure greater than 100 psi shall be a minimum of
36 inches in depth.
(4) All aerial lines must be in compliance with the National Electrical
Code.
(k) All
work shall be performed in compliance with city noise and nuisance
code requirements.
(l) The
permittee will be responsible for verifying the location both horizontal
and vertical of all facilities, whether by pot-holing, hand digging
or other method approved by the city. Handholes or manholes will not
be located in sidewalks, unless approved by the city.
(m) Placement
of all manholes and/or handholes must be approved in advance by the
city. Handholes or manholes will not be located in sidewalks, unless
approved by the city.
(n) Locate
flags shall not be removed from a location while facilities are being
constructed.
(o) Construction
that requires pumping of water or mud shall be contained in accordance
with federal and state law.
(p)
(1) The permit fee shall be computed on the gross value of the project as provided in the fee schedule in appendix
A of this code.
(2) Any water line of less than 1-1/2 inch diameter and less than 200
feet in length used for private purposes on private property shall
be exempt.
(3) Any liquid petroleum line smaller than 3/4 inch and fifty feet in
length used for home heating and on private property with shut-off
valve and regulator shall be exempt.
(4) Permit fees are exempt for all utilities and companies holding effective
franchise agreements.
(Ordinance 1999-33-0060, sec. 1(II),
adopted 12/13/99; Ordinance adopting
Code)
Whenever, by reasons of widening or straightening of streets,
water or sewer line projects, or any other public works projects (e.g.,
install or improve storm drains, water lines, sewer lines, etc.),
it shall be deemed necessary by the governing body of the city to
remove, alter, change, adapt, or conform the underground or overhead
facilities of a permittee to another part of the city, such alterations
shall be made by the owner of the facilities at their expense, unless
provided for by state law or an existing franchise until that franchise
expires or is otherwise terminated, within the time limits set by
the city working in conjunction with the owner or, if no time frame
can be approved, within one hundred twenty (120) days from the day
the notice was sent to make the alterations, unless a different schedule
has been approved by the city. Facilities not moved after one hundred
twenty (120) days or within the approved schedule, as it may be extended
from time to time, shall be deemed abandoned after one hundred thirty
(130) days' notice, except for force majeure.
(Ordinance 1999-33-0060, sec. 1(III),
adopted 12/13/99)
(a) Any
person doing work in the city shall properly install, repair, upgrade
and maintain facilities.
(b) Facilities
installed after the effective date of this article shall be considered
to be improperly installed, repaired, upgraded or maintained if:
(1) The installation, repairs, upgrade or maintenance endangers people;
(2) The facilities do not meet the applicable city codes;
(3) The facilities are not capable of being located using standard practices;
(4) The facilities are not located in the proper place at the time of
construction in accordance with the directions provided by the city.
(Ordinance 1999-33-0060, sec. 1(IV),
adopted 12/13/99)
(a) Users
of the right-of-way shall restore property affected by construction
of facilities to a condition that is equal to or better than the condition
of the property prior to the performance of the work.
(b) Restoration
must be to the reasonable satisfaction of the city and the property
owner. The restoration shall include, but not be limited to:
(1) Replacing all ground cover with the type of ground cover damaged
during work or better either by sodding or seeding, as directed by
the city;
(2) Installation of all manholes and handholes, as required;
(3) Backfilling all bore pits, potholes, trenches or any other holes
shall be filled in daily, unless other state or federal safety requirements
are followed;
(4) Leveling of all trenches and backhoe lines;
(5) Restoration of the excavation site to city specifications; and
(6) Restoration of all landscaping, ground cover, and sprinkler systems.
(c) All
locate flags and information signs shall be removed during the cleanup
process by the permittee or his/her contractor at the completion of
the work.
(d) Restoration
must be made in a timely manner as specified by approved public works
schedules and to the satisfaction of the city. If restoration is not
satisfactory and performed in a timely manner, all work in progress,
except that related to the problem, including all work previously
permitted but not completed, may be halted and a hold may be placed
on any permit not approved until all restoration is complete.
(Ordinance 1999-33-0060, sec. 1(V),
adopted 12/13/99)
If any of the provisions of this article are not followed, the
city may revoke a permit and impose a fine. The fine for failure to
comply is $200.00 for violation of this article and up to $50.00 per
day after the third day of violation until compliance. If a person
has not followed the terms and conditions of this article in work
done pursuant to a prior permit, new permits may be denied or additional
terms required. Any request for permit which is considered unjustly
wasteful of surface rights and/or unjustly damaging to the welfare,
safety, and health of the city and/or its citizens may be refused
by an authorized city agent.
(Ordinance 1999-33-0060, sec. 1(VII),
adopted 12/13/99)
Appeal from denial or revocation of permit or from the decision
of the city shall be to the city council. Appeals shall be filed with
the city secretary within fifteen (15) days.
(Ordinance 1999-33-0060, sec. 1(VIII),
adopted 12/13/99)