A.
The applicant shall construct all roads, streets, lanes or alleys, together with all other improvements whether public or private, including grading, paving, curbs, gutters, sidewalks, streetlights, fire hydrants, water mains, street signs, shade trees, storm drainage facilities, sanitary sewers, landscaping, traffic control devices, open space and restricted areas and erosion and sediment control measures in conformance with the final plan as approved, and applicable provisions of the Pennsylvania Department of Transportation Specifications, Publication 408, dated 1987, or the latest revision thereto, or other applicable regulations.
B.
No plat shall be finally approved for recording, and no building permits shall be issued until the applicant has completed all required improvements or has provided a performance guarantee in accordance with § 109-309, hereof.
C.
If financial security has been provided in lieu of the completion of required improvements, the Township shall not condition the issuance of building, grading or other permits upon actual completion of the improvements depicted upon the approved final plat. Moreover, if said financial security has been provided, occupancy permits for any building or buildings to be erected shall not be withheld on the basis that all improvements have not been completed, provided that the improvement of the streets providing access to and from existing public roads to such building or buildings to a mud-free or otherwise permanently passable condition, as well as the completion of all other improvements as depicted upon the approved plat, if such improvements are necessary for the reasonable use of or occupancy of the building or buildings, and provided that the developer is in full compliance with the plan, the subdivision and land development improvements agreement required by § 109-308 and the performance guarantee required by § 109-309.
D.
On or before the completion of subdivision or land development improvements, the permanent stormwater management system for a tract shall be installed or constructed in accordance with the approved stormwater management plan. All such work shall be as specified in the approved plan. Continued functioning of these facilities shall be maintained, as necessary, in accordance with § 109-310, for the maintenance bond period required by §§ 109-602 and 109-606 of this chapter and Chapter 75, Grading, Chapter 104, Stormwater Management, of the Code of Sadsbury Township.
[Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. I)]
F.
At all times during the construction of the project, stone beds shall be positioned at all points exiting the site to facilitate the cleaning of mud and debris from all vehicles leaving the site.
G.
No burning or burying of trash or debris anywhere on the site shall be permitted. To ensure that all trash and debris is removed, a trash container of adequate capacity shall be placed at appropriate locations on the work site.