In this section:
An owner or authorized agent of an owner, who submits an application for a permit under this division.
A drawing or plan that shows the horizontal and vertical alignment, facility dimensions, type of encasement, and any other information determined by the director to help identify and protect the facility installed in the right-of-way.
A day on which city offices conduct business.
Actual damages, whether direct or indirect, to the surface or subsurface of the right-of-way or adjacent area.
The department designated by the city manager.
The department director designated by the city manager or Director’s designee.
Operations or repairs of facilities to prevent imminent harm to the health, safety, or welfare of persons or property.
An activity that removes or otherwise disturbs soil, pavement, driveways, curbs, or sidewalks in the right-of-way. Excavation does not include routine homeowner maintenance and landscaping activity immediately adjacent to the homeowner’s property line, unless the activity removes or disturbs the paved portion of the right-of-way.
A document describing the order, estimated start and completion dates of all excavation projects approved during a six month period.
Property or equipment permanently located in the right-of-way except equipment related to landscaping activity.
The placement or construction of a facility on-site, whether the placement of construction is on, below, or above the surface of the right-of-way, for a term longer than 180 days, and includes replacement or modification of the facility.
The paved portion of the right-of-way that has been constructed or reconstructed:
A person or entity, other than the City, who owns or controls a facility in a right-of-way.
A permit issued under this division to excavate or to install facilities in the right-of-way.
A person who receives a permit under this division and that person’s agent.
A document listing the proposed excavation route, the estimated length, width, and depth of the facilities installed along that route, and the projected date that the applicant will begin excavation on a project.
The total surface area, and the area above and below the surface, between property lines that is dedicated, deeded, reserved by plat or otherwise owned or controlled by the City or State as a public roadway, highway, street, public sidewalk, alley, waterway, or utility easement in which the municipality has an interest.
A specific portion of right-of-way designated by the director for the placement of a facility.
An excavation project of 300 linear feet or less.
(Ordinance CO15-19-05-09-E1 adopted 5/9/19)