As used in this division, the following terms shall have the respective meanings ascribed to them:
Boundary sanitary sewer lift station.
A sanitary sewer lift station built for serving a specific development, which can also serve property not included in the development but adjacent to it that may develop in the future.
Boundary sewer.
A sewer installed in a street bounding a development or faced on only one side by a development, which can also serve property not included in the development on the opposite side of the street.
Boundary water line.
A water line, installed in a street bounding a development or faced on only one side by a development, which can also serve property not included in the development on the opposite side of the street.
Department.
The water utilities department of the city.
Development.
A subdivision, as defined in the city’s subdivision regulations.
Director.
The director of the water utilities department or his appointed representative.
Engineer.
A professional engineer licensed by the state.
Lot.
Land occupied or intended for occupancy by a main building together with its accessory buildings, and the yard and parking spaces required, and having its principal frontage upon a street as defined herein.
Owner’s front footage.
Owner’s front footage, for purposes of determining pro rata charges to be paid by the owner of a lot for sewer service or water service and for which there will be no reimbursement, shall be determined by the owner’s lot condition, as follows:
(1) 
Regular lot.
A lot generally rectangular in shape. Front footage of a regular lot shall be measured along the property line facing the street.
(2) 
Irregular lot.
Any lot of a nonrectangular shape, except the radial lot defined below. The front footage of an irregular lot shall be equal to one front foot for each one hundred twenty-five (125) square feet of lot area, but shall never exceed the maximum measured width of the lot at any depth of the lot, parallel to the street line.
(3) 
Radial lot.
A lot abutting a curved street and in general having sides which are radial to the street. Front footage of a radial lot shall be measured as the chord distance at a point twenty-five (25) feet from the front property line.
(4) 
Corner lot.
A lot situated on the corner of a block and having more than one side facing a street. Front footage shall be measured along the side of the lot to which service connection is made.
Pro rata.
The charge per front foot of abutting land to be paid by the lot owner or owner of a development to aid in defraying the cost of supplying sewer service or water service (as the case may be) to their lot or site. The amount of the charge will be determined by the department.
(1) 
Single pro rata.
The charge based on the front footage of abutting land on only one side of the street or easement.
(2) 
Double pro rata.
The charge based on the front footage of abutting land on both sides of the street or easement.
Street.
A public thoroughfare which has been dedicated or deeded to the public for public use, which has been officially approved by the governing body of the city, and which affords the principal means of access to property abutting it.
(1958 Code, sec. 40A-2; 1978 Code, sec. 28-80; Ordinance 08-040, sec. 31, adopted 5/13/08; Ordinance 09-065, sec. 1, adopted 11/17/09)
The purpose of this article is to establish a policy for the city for extending sanitary sewer and water lines and for the sewer and water service connections to such extensions, and to establish rules governing such extensions and connections. The article also establishes rules governing the construction of sanitary sewer lift stations. It is not the intention of this article to obligate, and the city shall not be obligated to participate in or proceed with any construction covered by this article when funds are not available or when, in the discretion of the director of water utilities, the construction is not practical. It is not the intention of this article to limit the right of the city to extend sanitary sewer or water lines at its own cost and collect the charges herein set forth from the applicants for sewer or water service, and such right is herein reserved. The city shall own all sewer lines, water lines, and sanitary sewer lift stations, including service connections, constructed and accepted under the terms of this article.
(1958 Code, sec. 40A-1; 1978 Code, sec. 28-81; Ordinance 08-040, sec. 32, adopted 5/13/08; Ordinance 09-065, sec. 2, adopted 11/17/09)
Sanitary sewer lines or water lines will be extended in the city in accordance with the following rules:
(1) 
Individual lots.
Sanitary sewers and water lines of proper size will be extended by the city in its easements and streets to serve individual lots, according to the following rules:
(A) 
For the first three hundred (300) feet of the extension (not including the width of street intersections and alleys), the lot owner requesting extension shall pay single pro rata for the distance of the extension. This pro rata is reimbursable as hereinafter provided, except for the pro rata paid on the owner’s front footage.
(B) 
For the remainder of the extension required to install the sewer or water line across the total width of the lot of the owner requesting extension, the lot owner shall pay double pro rata. This pro rata is reimbursable as hereinafter provided, except for the pro rata paid on the owner’s front footage.
(C) 
Should the lot owner requesting extension require a sewer or water line in excess of the size required by the city, the owner shall pay all additional costs for the oversize sewer or water line.
(D) 
In addition to the payments specified above, the lot owner or customer must pay the appropriate service connection charges before service connections can be made.
(E) 
No construction shall be scheduled nor begun by the city until all extension charges have been paid to the city.
(2) 
Developments.
The owner of a development shall pay for and install all sewer and water lines and necessary appurtenances thereto within the boundaries of the development.
The city will extend sewers or water lines of proper capacity outside the boundaries of the development to service the development after the following applicable requirements have been satisfied:
(A) 
The owner of the development shall pay all costs for installation of sewer or water line extensions required to extend services to the boundary of the development.
(B) 
Should the extension involve the construction of a boundary sewer or boundary water line, the owner of the development shall pay double pro rata to the city based on the footage of the development property abutting the boundary sewer or boundary water line, as applicable.
(C) 
Should the city require water line extensions or interior water lines larger in size than required for the development so long as said water lines are between the sizes of six (6) inches and sixteen (16) inches, inclusive, the city shall pay one and one-half (1.5) times the difference in cost of materials for said water lines. Also, due allowance shall be made to the owner of the development for intersections and alleys crossed, outside the development.
Should the city require sewer line extensions or interior sewers larger in size than required for the development, the city shall pay for that portion of material cost over and above such requirements. Also, due allowance shall be made to the owner of the development for intersections and alleys crossed, outside the development.
(D) 
No sewer or water line extension shall be scheduled until all charges specified herein have been paid by the owner of the development to the city.
(1958 Code, sec. 40A-3; Ordinance 75-46, sec. 1, adopted 7/15/75; 1978 Code, sec. 28-82; Ordinance 09-065, sec. 3, adopted 11/17/09)
When no extension of sanitary sewer or water lines (as the case may be) is necessary to serve an applicant for service, the applicant shall pay pro rata on the owner’s front footage in addition to the service connection charge before connection is made to the sewer or water line. However, if the sewer or water line is within a development, or if the connection is to be made to a sewer or water line existing on the date of passage of this division, only the service connection charge shall be paid.
(1958 Code, sec. 40A-4; 1978 Code, sec. 28-83)
After October 22, 1968, the city shall not collect pro rata on the owner’s front footage from any applicant for water or sewer service to a lot upon which the main building or structure was completed and in existence on October 22, 1968, nor from any applicant for service to a lot upon which a main building or structure exists for five (5) years after October 22, 1968, without being provided a sewer and water line upon which connection could be made. Service connection charges shall, however, be paid by such applicants.
(1958 Code, sec. 40A-4.1; 1978 Code, sec. 28-84)
(a) 
Owners of lots or developments who participate under this policy in the cost of sewer or water line extensions to their lots or sites are eligible for certain reimbursement of such cost, as specified herein, from the city. Except as provided in subsection (b) below, such owners are eligible for reimbursement to be made from pro rata collected by the city from connections to the sewer extension or water line extension (as the case may be) during the period of five (5) years after completion of the extension, according to the following rules:
(1) 
No reimbursement shall be made to a lot owner for the owner’s front footage pro rata. No reimbursement shall be made to a development owner for the cost of sewers or water lines within the boundaries of the development.
(2) 
Upon written application of the owner, reimbursements shall be made once each year during the month of October to cover reimbursable charges collected during the preceding fiscal year.
(3) 
A lot owner will be reimbursed one-half the amount of pro rata collected from connections to that portion (the first three hundred (300) foot section provided for in section 22.02.143(1)(A)) up to the boundary of the owner’s lot.
(4) 
A lot owner will be reimbursed the amount of double pro rata collected from connections to extensions in excess of the three hundred (300) foot section provided for in section 22.02.143(1)(A), up to the boundary of the owner’s lot.
(5) 
A lot owner will be reimbursed the amount of single pro rata collected for connections from the owner’s opposite frontage.
(6) 
Owners of developments will be reimbursed the amount of pro rata collected from connections to off-site extensions (outside the development) and boundary sewers and boundary water lines for which they have made payment.
(7) 
An owner will never be paid more than one hundred (100) percent of the amount actually paid by such owner for extensions along frontage other than his own property.
(8) 
No reimbursements shall be made by the city to an owner after one year from the end of the five (5) year period of eligibility.
(b) 
In addition to the reimbursements provided for above, the owner of a lot used for an industrial or commercial establishment, who has paid additional costs for oversized water lines, as provided in section 22.02.143(1)(C), shall be eligible for additional reimbursement from water revenues from said water line extension, in the amount of forty (40) percent of the annual gross revenue, for a period of five (5) years from the date of completion of the extension, provided that the additional reimbursement shall never exceed eighty (80) percent of the total additional cost of the extension.
(1958 Code, sec. 40A-5; 1978 Code, sec. 28-85)
The city may, with specific approval of the city council, extend sewer or water service outside of the city, according to the following rules:
(1) 
The provisions of section 22.02.143, with the exception of the reimbursement provisions, shall apply to sewer and water line extensions outside the city limits.
(2) 
Any lot owner applying for service connections to sewers or water lines extended under the terms of this division shall pay single pro rata on the owner’s front footage.
(3) 
All applicants for sewer or water service shall pay double the service connection charge applicable within the city.
(4) 
There shall be no reimbursement for extensions outside the city.
(1958 Code, sec. 40A-6; 1978 Code, sec. 28-86)
(a) 
Before work begins under a contract for construction of sewers or water lines in a development, proof of the following must be submitted to the director by the owner of the development:
(1) 
All construction will be in accordance with department approved plans and specifications.
(2) 
The contractor has public liability insurance acceptable to the city in the amount of not less than two hundred fifty thousand dollars/five hundred thousand dollars ($250,000.00/$500,000.00) for bodily injury and twenty thousand dollars ($20,000.00) for property damage.
(b) 
When all of the requirements of this section have been met, the director will issue a letter to the owner of the development giving permission to begin construction.
(c) 
All sewer and water line installations shall be designed in accordance with criteria and specifications established by the department.
(d) 
All engineering services shall be provided by the city for extensions to individual lots with costs thereof included in the total cost of construction.
(e) 
All engineering services required, including resident inspection, for construction of sewers or water lines within the boundaries of developments shall be furnished by the development’s engineer. Plans, specifications and contract documents shall be approved by the department prior to construction.
(f) 
Responsibility for resident inspection of construction shall be included in and be a part of the engineering services set forth above. During actual construction, the engineer, or his representative, shall be on the site at all times. The engineer shall have the right to halt construction when there is an indication that the plans and specifications are not being or have not been followed until such deviations are corrected to his satisfaction. The engineer shall, upon satisfactory completion of the project, issue to the director a letter certifying the construction meets the requirements of all the plans and specifications and was completed to the satisfaction of the engineer.
(g) 
In addition to the resident inspection specified above, and where resident inspection is not a responsibility of the department, department inspectors shall visit the site periodically and, upon project completion, shall recommend to the director that final approval be given.
(h) 
The owner of a development desiring sewer or water line extension to its boundary shall submit a written request to the director listing the lots and blocks of the property abutting the extension. Two (2) approved plats of the area to be served shall be included with the request and become the property of the city. If the area for which service is requested is part of a larger area owned or controlled by the owner of the development and which can reasonably be expected to require future extensions, then two (2) preliminary plats of the larger area shall also be submitted showing a tentative design of overall layout for the entire area.
(1958 Code, sec. 40A-7; 1978 Code, sec. 28-87; Ordinance 08-040, sec. 33, adopted 5/13/08)
(a) 
If a boundary sanitary sewer lift station is required to provide sanitary sewer service to the development, the developer should be responsible for the design and construction costs of such sanitary sewer lift station and all related appurtenances.
(b) 
The city may require the developer to increase the structure, motor, and pump sizes of the sanitary sewer lift station to accommodate future developments in the area. If funds are available, the city will participate in the construction cost for acreage outside the limits of the proposed development. The city’s participation value shall be determined by the number of acres outside the limits of the proposed development multiplied by the sanitary sewer lift station construction cost per acre at the time of installation. The city will not participate in any cost if the structure is sized for the proposed subdivision and additional wastewater flow to the sanitary sewer lift station will only require pump and motor changes and/or modifications.
(c) 
The owners of future adjacent developments that have to discharge wastewater to an existing boundary sanitary sewer lift station, must reimburse the city or the developer of the sanitary sewer lift station. The pro-rata reimbursement will be determined based on the total acreage the sanitary sewer lift station was required to accommodate and the sanitary sewer lift station construction cost per acre. The reimbursement value shall be determined by number of acres added to the sanitary sewer lift station multiplied by the construction cost per acre at the time of installation. The owners of the new developments will also be responsible for any and all required changes and/or modifications to the existing pumps and motors.
(d) 
The construction cost of a sanitary sewer lift station shall be obtained through a bidding process abiding by state procurement laws to guarantee compatible pricing to the city and the developers. The date when the sanitary sewer lift station was built will not affect the content of this section.
(Ordinance 09-065, sec. 4, adopted 11/17/09)