A.
The minimum control requirements established in this section and the Design Manual are as follows:
(1)
The planning techniques, nonstructural practices, and design methods specified in the Design Manual shall be used to implement ESD to the MEP. The use of ESD planning techniques and treatment practices shall be exhausted before any structural BMP is implemented. Stormwater management plans for development projects subject to this chapter shall be designed using ESD sizing criteria, recharge volume, water quality volume, and channel protection storage volume criteria according to the Design Manual. The MEP standard is met when channel stability is maintained, pre-development groundwater recharge is replicated, nonpoint source pollution is minimized, and structural stormwater management practices are used only if determined to be absolutely necessary.
(2)
Control of the two-year and ten-year frequency storm event is required according to the Design Manual, and all subsequent revisions, if the Denton Town Engineer determines that additional stormwater management is necessary because historical flooding problems exist and downstream floodplain development and conveyance system design cannot be controlled.
(3)
The Denton Town Engineer may require more than the minimum control requirements specified in this chapter if hydrologic or topographic conditions warrant or if flooding, stream channel erosion, or water quality problems exist downstream from a proposed project.
B.
Alternate minimum control requirements may be adopted by the Town subject to Administration approval.
C.
Stormwater management and development plans, where applicable, shall be consistent with adopted and approved watershed management plans or flood management plans as approved by the Maryland Department of the Environment in accordance with the Flood Hazard Management Act of 1976.