(a) 
Construction code permit fees shall be paid in accordance with the following fee schedule. Unlisted fees shall be determined by ordinance.
(b) 
Building.
(1) 
The following fee schedule is adopted for all commercial construction:
(A) 
Permit fees.
Commercial Valuation Table
Total Evaluation
Fee
$1,000.00 and less
$250 base fee.
$1,001.00 to $50,000.00
$700.00 for the first $1,001.00 plus $5.75 for each additional thousand or fraction thereof, to and including $50,000.00.
$50,001.00 to $100,000.00
$800.00 for the first $50,001.00 plus $4.75 for each additional thousand or fraction thereof, to and including $100,000.00.
$100,001.00 to $500,000.00
$1,000.00 for the first $100,001.00 plus $3.50 for each additional thousand or fraction thereof, to and including $500,000.00.
$500,001.00 to $1,000,000.00
$3,500.00 for the first $500,001.00 plus $3.00 for each additional thousand or fraction thereof.
$1,000,001.00 and up
$4,000.00 for the first $1,000,001.00 plus $3.00 for each additional thousand or fraction thereof.
(B) 
Plan-checking fees.
A plan-checking fee shall be paid at the time of submitting plans and specifications for checking. Said plan-checking fee shall be equal to one-half of the building permit fee. Such plan checking fee is in addition to the building permit fee.
(2) 
In addition to the fee schedule adopted in subsection (1), the following fee schedule shall also apply:
(A) 
Permit fees for new single-family dwellings shall be as follows: $0.35 per square foot.
(B) 
For all residential building permits that require plans to be submitted, a planchecking fee shall be paid at the time of submitting plans and specifications for checking. Said plan-checking fee shall be equal to one-half of the building permit fee. Such plan checking fee is in addition to the building permit fee.
(C) 
Permit fee for structures under 500 square feet with a concrete foundation is a base fee of $50.00 plus $.08 a square foot. Permit fee for structures under 500 square feet without concrete foundation is $25.00.
(D) 
Permit fee for structures over 500 square feet with a concrete foundation is a base fee of $100.00 plus $.08 a square foot. Permit fee for structures over 500 square feet without concrete foundation is $25.00.
(E) 
Permit fee for open air patio covers (including outdoor kitchen) with or without screens and no solid walls is $ a flat fee of $15.00.
(F) 
Permit fee for front porches up to 4’ x 6’ on mobile homes, open air with no solid walls, is $25.00. The 6’ dimension shall be parallel to the mobile home and the roof shall be the same height as the home roof above the entrance door, front or rear, with a minimum of ten feet separating the two structures.
(G) 
Reinspection fee is $50.00 for the first reinspection, and the fee increases in increments of $25.00 each for each subsequent reinspection.
(H) 
Permit fee for re-roof of any residential structure is $15.00, all other structures to be based on the commercial valuation table.
(I) 
Permit fee for any build-out with no additional square footage is $ 15.00 for single-family residential structures. All other structures to be based on the commercial valuation table.
(J) 
In addition to the fees set out above, the applicant shall pay an application fee of $30.00.
(K) 
Moving fee for the moving of any building or structure shall be $100.00.
(L) 
Demolition fee for the demolition of any building or structure, the fee shall be:
0 up to 100,000 cu. ft.
$50.00
100,000 cu. ft. and over
$0.50/1,000 cu. ft.
(M) 
Deck permit fees for wood decks shall be $25.00.
(c) 
Plumbing.
(1) 
Application preparation: $30.00.
(2) 
Minimum fee: $15.00.
(3) 
Each fixture: $3.00.
(4) 
Each house sewer: $10.00.
(5) 
Each house sewer repair: $10.00.
(6) 
Water heater and/or vent: $5.00.
(7) 
Each house water supply: $10.00.
(8) 
Each house water supply repair: $10.00.
(9) 
Disconnect and plug main sewer trap: $10.00.
(10) 
Catchbasins and area drains: $5.00.
(11) 
Roof or outside drain connected to drain system: $5.00.
(12) 
Water piping for water treatment equipment: $5.00.
(13) 
Lawn sprinkler with 5 heads: $10.00.
(14) 
Each additional sprinkler head: $1.50.
(15) 
1st reinspection: $50.00. Fee increases in increments of $25.00 for each subsequent reinspection.
(16) 
Fire sprinkler system per head: $1.50.
(d) 
Gas.
(1) 
Application preparation: $30.00.
(2) 
Minimum fee to 5 outlets: $15.00.
(3) 
Each additional outlet: $1.00.
(4) 
Gas fixtures (furnace, A/C, etc., per unit): $10.00.
(5) 
1st reinspection: $50.00. Fee increases in increments of $25.00 for each subsequent reinspection.
(e) 
Mechanical.
(1) 
Application preparation: $30.00.
(2) 
$20.00 basic.
(3) 
$10.00 first $1,000.00 of valuation of work.
(4) 
$3.00 each additional $1,000.00 or fraction of valuation of work.
(5) 
1st reinspection: $50.00. Fee increases in increments of $25.00 for each subsequent reinspection.
(f) 
Electrical.
(1) 
Application preparation: $30.00.
(2) 
Meter loop and service:
(A) 
Max 200 AMPS: $10.00.
(B) 
Each additional AMP: $0.15.
(3) 
Outlets: $0.50.
(4) 
Lighting fixtures: $0050.
(5) 
Range receptacle: $2.00.
(6) 
Clothes dryer: $2.00.
(7) 
Cooking top: $2.00.
(8) 
Oven: $2.00.
(9) 
Garbage disposal: $2.00.
(10) 
Dishwasher: $2.00.
(11) 
Electric heater: $2.00.
(12) 
Window A/C recp: $2.00.
(13) 
Temporary saw pole:
(A) 
Max 100 AMPS: $15.00.
(B) 
Each additional AMP: $0.15.
(14) 
Temporary cut in: $15.00.
(15) 
Reconnection fee: $15.00.
(16) 
Motors:
(A) 
Up to/not including 1/2HP: $1.00.
(B) 
1/2HP/less than 10HP: $5.00.
(C) 
10HP/less than 50HP: $8.00.
(D) 
50HP/less than 100HP: $12.00.
(E) 
100HP/less than 150HP: $15.00.
(F) 
150HP and over: $18.00.
(G) 
Generator: $100.00.
(H) 
X-ray machine: $8.00.
(17) 
Signs: Sign install inspect K/VA: $6.00.
(18) 
1st reinspection: $50.00. Fee increases in increments of $25.00 for each subsequent reinspection.
(g) 
Fire alarm fees.
(1) 
Application preparation: $30.00.
(2) 
$1,000.00-$50,000.00: $15.00. Plus $5.00/th over $1,000 or fraction.
(3) 
$50,001.00-$100,000.00: $260.00. Plus $4.00/th over $50,000 or fraction.
(4) 
1st reinspection: $50.00. Fee increases in increments of $25.00 for each subsequent reinspection.
(h) 
Construction of patios with no cover, driveways, parking lots and sidewalks.
(1) 
Application preparation: $30.00.
(2) 
First driveway: $8.00.
(3) 
Each additional driveway: $4.50.
(4) 
Flatwork, parking lots and paved areas:
(A) 
Up to 1,000 square feet: $30.00.
(B) 
Each additional 1,000 square feet: $1.50.
(5) 
Sidewalks and/or walkways.
(A) 
First 100 linear feet: $15.00.
(B) 
Each additional 100 linear feet: $3.00.
(C) 
1st reinspection: $50.00. Fee increases in increments of $25.00 for each subsequent reinspection.
(i) 
Dumpster enclosure and pad:
$50.00.
(j) 
Swimming; pools including pool deck.
(1) 
Application preparation: $30.00.
(2) 
Commercial: $980.00.
(3) 
Residential: $110.00.
(4) 
1st reinspection: $50.00. Fee increases in increments of $25.00 for each subsequent reinspection.
(k) 
Double fee for commencing work without permit.
Where work for which a permit is required by this code is started or proceeded with prior to obtaining said permit, the fees herein specified shall be double, but the payment of such double fee shall not relieve any person from fully complying with the requirements of this code in the execution of the work nor from any other penalties prescribed herein.
(Ordinance 3001 adopted 9/27/21)
(a) 
Development plan filing fee.
No land shall be developed for use as a manufactured home park and no plan for such park shall be filed or recorded until submitted to the planning commission for approval. Such plan shall be accompanied by a filing fee of fifty dollars ($50.00).
(b) 
License fee.
The annual license fee for each manufactured home park shall be twenty-five dollars ($25.00) per year or fraction thereof for the first two (2) mobile home spaces and a two dollar ($2.00) fee for each additional manufactured home space. The fee for the transfer of such license shall be twenty-five dollars ($25.00).
(Ordinance 3001 adopted 9/27/21)
(a) 
The applicant shall pay a fee of fifteen dollars ($15.00) to the city for the permit at the time of filing the application.
(b) 
The applicant shall pay a fee of twenty-five dollars ($25.00) to the city for life safety inspection for reconnect for electrical service.
(c) 
Application fee: $30.00.
(Ordinance 3001 adopted 9/27/21)
(a) 
Building permit.
(1) 
Site inspections:
(A) 
Ground, projecting or portable signs: $40.00.
(B) 
Wall, roof, marquee or canopy signs: $20.00.
(C) 
Site reinspection fee: $20.00.
(2) 
Construction or reconstruction:
(A) 
For 1st 50 square feet of sign face: $20.00.
(B) 
Each square foot or fraction thereof exceeding 50 square feet: $0.15.
(3) 
1st reinspection: $50.00. Fee increases in increments of $25.00 for each subsequent reinspection.
(b) 
Operating permit.
Each application for an operating permit shall be accompanied by a fee of twenty-five dollars ($25.00) for each sign for which a permit is sought.
(c) 
No refund of fees.
The applicant for a permit or holder of a permit shall not be entitled to a refund of any fee paid in case the permit is revoked.
(d) 
Deposit or bond.
When any work on a sign or sign structure is to be done beyond the curbline or on or above public property which may cause the city to sustain loss, damage or injury to public property, or to be put to expense in correcting conditions resulting therefrom, the sign administrator shall require the person proposing to do such work to furnish a bond in the amount of twenty-five thousand dollars ($25,000.00), in the form determined by the city legal department, or to post a deposit of a like amount, to indemnify the city against any cost that may be incurred or any loss, damage or injury that may be sustained by the city because of such work, and as a guarantee of compliance with applicable laws and ordinances. Such required bond or deposit shall be furnished or posted before any permit is issued to work.
(e) 
Unlawful signs in right-of-way.
Any sign so held may be redeemed by the owner thereof upon the payment of a fee to the city through the sign administrator, consisting of a total of fifty dollars ($50.00) for hauling the same to storage plus ten dollars ($10.00) per day storage fee for each day the sign is stored. Such fee shall be in addition to and not in lieu of any fine imposed upon such owner. Any sign impounded and stored and not redeemed by the owner thereof within thirty (30) days may be sold at public auction in the same manner as surplus or abandoned property of the city.
(Ordinance 3001 adopted 9/27/21)
Each application shall be accompanied by a fee of twenty-five dollars ($25.00). In the event final inspection reveals the installation does not comply with the specifications.
(Ordinance 3001 adopted 9/27/21)
The annual fee for contractor registration is $100.00 plus an administration fee of $100.00 per year or any part thereof. This will be good for a 12-month period from the date the application is processed.
(Ordinance 3001 adopted 9/27/21)
(a) 
Commercial:
$750.00 for appeals of any contested decision involving any commercial structure, including commercial homebuilders constructing custom homes or homes for speculation.
(b) 
Homeowner:
$200.00 for any appeal from a homeowner who occupies the building or structure involved in the decision being appealed.
(c) 
Request for staff review:
(1) 
$200.00 for any review of the appeal beyond the initial review by city personnel either prior to filing or after filing for each review requested;
(2) 
$50.00 for a review of appeal made by the owner-occupied structure/use made the basis of the appeal.
(Ordinance 3001 adopted 9/27/21)