All ROW fees paid to the city pursuant to this chapter, excluding
permit issuance and small cell fees, shall be deposited in a fund
and shall be expended only for the repair, resurfacing, rehabilitation,
reconstruction, or other improvement of city streets.
(Ordinance 2021-O0171 adopted 12/14/2021)
Upon registration, all ROW users shall provide the city a fifty
thousand dollar ($50,000.00) perpetual bond issued by an insurance
company licensed to operate in the state, valid until released by
city engineer. City engineer will release bond twelve (12) months
after last permit issued.
(Ordinance 2021-O0171 adopted 12/14/2021)
(a) Any contractor or city crews installing facilities that will ultimately
be owned or managed by the city will be exempted for obtaining a bond
or cash-equivalent.
(b) Any contractor or city crews working within the ROW on behalf of
the city shall be exempt from permit application fee.
(c) Work conducted within the ROW done by a ROW user’s own W-2
employees shall not require a bond or cash-equivalent.
(d) Any excavation deemed an emergency as described by this article section
37.01.011 shall not require a bond or cash-equivalent.
(Ordinance 2021-O0171 adopted 12/14/2021)
There is a permit application fee of twenty-five dollars ($25.00).
Permits shall be issued or denied within five (5) days of a completed
application being received by the city.
(Ordinance 2021-O0171 adopted 12/14/2021)
There shall be no fee for inspection.
(Ordinance 2021-O0171 adopted 12/14/2021)
Roadway usage fee of fifty dollars ($50.00) per day shall be applied to any permit that exceeds the completion date established on the permit, or fails to meet any established time line as defined in this article, section
37.01.035.
(Ordinance 2021-O0171 adopted 12/14/2021)