(a)
Within either one hundred eighty (180) days after the effective date of a categorical pretreatment standard, or one hundred eighty (180) days after the final administrative decision made on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing significant industrial users subject to such categorical pretreatment standards, and currently discharging to or scheduled to discharge to the POTW, shall be required to submit to the city a report which contains the information listed in subsections (c)(1)–(7), below.
(b)
At least ninety (90) days prior to commencement of their discharge, new sources, and sources that become industrial users subsequent to the promulgation of an applicable categorical standard, shall be required to submit to the city a report which contains the information listed in subsections (c)(1)-(5), below. New sources shall also be required to report information on the method of pretreatment the source intends to use to meet applicable pretreatment standards. New sources shall give estimates of its anticipated flow and quantity of pollutants discharged, as required in subsections (c)(4)–(5), below.
The city manager shall approve and issue a form to be used for guidance in completion of the baseline monitoring report.
(c)
The industrial user shall submit the information required by this section including:
(1)
Identifying information.
The name and address of the facility including the name of the operator and owners.
(2)
Environmental permits.
A list of any environmental control permits held by or for the facility.
(3)
Description of operations.
A brief description of the nature, average rate of production, and standard industrial classification of the operation(s) carried out by such industrial user. This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated processes.
(4)
Flow measurement.
Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams as necessary to allow use of the combined wastestream formula set out in 40 CFR 403.6(e). (The control authority may allow for verifiable estimates of these flows where justified by cost or feasibility considerations.)
(5)
Measurement of pollutants.
(A)
Identify the categorical pretreatment standards applicable to each regulated process;
(B)
Submit the results of sampling and analysis identifying the nature and concentration (and/or mass, where required by the standard or by the city) of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum and average concentrations (or mass, where required) shall be reported. The sample shall be representative of daily operations;
(D)
Submit documentation to demonstrate compliance with a BMP where a required BMP or pollution prevention (P2) alternative is part of the categorical standard
(6)
Certification.
A statement reviewed by the industrial user’s authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis; and, if not, whether additional operation and maintenance (O & M) and/or additional pretreatment is required for the industrial user to meet the pretreatment standards and requirements.
(7)
Compliance schedule.
If additional pretreatment and/or O & M will be required to meet the pretreatment standards, the shortest schedule by which the industrial user will provide such additional pretreatment and/or O & M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in section 13.07.497 of this division.
(A)
If the categorical pretreatment standard is modified by a removal allowance (403.7), the combined wastestream formula (403.6(e), and/or a fundamentally different factors variance (403.13)); at the time the user submits the baseline monitoring report, the information required by subsections (c)(6)–(7) shall pertain to the modified limits.
(B)
If the user submits the baseline monitoring report after a modified pretreatment standard, the combined wastestream formula and/or a fundamentally different factors variance is used, those requirements in subsections (c)(6)–(7) must be submitted within sixty (60) days after the modified limit is approved.
(d)
The control authority may allow the submission of a baseline report which utilizes only historical data so long as the data provides information sufficient to determine the need, or lack thereof, for industrial pretreatment measures.
(Ordinance 6444 adopted 1/3/22)