The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:
Advisory committee.The committee as designated by the city council to provide recommendations regarding the provisions of this article.
Assessment.The determination of the amount of the maximum impact fee per service unit which can be imposed on new development pursuant to this article.
Capital improvement.Either a water facility or a wastewater facility, with a life expectancy of three or more years, to be owned and operated by or on behalf of the city.
Credit.The amount of the reduction of an impact fee due that is equal to the value of a water facility or a wastewater facility, as determined under this article or pursuant to administrative guidelines, provided by a property owner pursuant to a contract for capital improvements authorized in this article, consistent with the city's subdivision or other development regulations or requirements. Credit does not include a reduction in the amount of an impact fee due for payment of connection charges or for pro rata charges pursuant to article
22.04.
Facility expansion.The expansion of the capacity of any existing water or wastewater improvement for the purpose of serving new development. The term does not include the repair, maintenance, modernization or expansion of an existing facility to better serve existing development.
Impact fee.Either a fee for water facilities or a fee for wastewater facilities imposed on new development by the city pursuant to this article in order to generate revenue to fund or recoup the costs of capital improvements or facility expansion necessitated by and attributable to such new development. Impact fees do not include a requirement for the dedication of rights-of-way or easements for such facilities, or a requirement for the construction of such improvements, imposed pursuant to the city's zoning or subdivision regulations. Impact fees also do not include payment of connection charges or pro rata charges imposed pursuant to article
22.04.
Impact fee capital improvements plan.The adopted plan, as may be amended from time to time, either for wastewater improvements, which identifies the wastewater facilities or wastewater expansions and their associated costs, or for water improvements, which identifies the water facilities or water expansions and their associated costs, which are necessitated by and which are attributable to new development, for a period not to exceed ten years, which plan is incorporated by reference in this article and which is to be financed, in whole or in part, through the imposition of impact fees pursuant to this article. The impact fee capital improvements plan may include approximate dates for commencement of identified projects, which dates are advisory.
Land use assumptions.A description of the service area and projections of changes in land uses, densities, intensities and population in the service area over at least a ten-year period which has been adopted by the city and upon which the impact fee capital improvements plan is based.
New development.A project involving the construction, reconstruction, redevelopment, conversion, structural alteration, relocation or enlargement of any structure, or any use or extension of the use of land, any of which has the effect of increasing the requirements for capital improvements or facility expansions, measured by the number of service units to be generated by such activity, and which requires either the approval of a plat pursuant to the city's subdivision regulations, the issuance of a building permit, or connection to the city's water or wastewater system, and which has not been exempted from this article by provisions in this article or attached to this article.
Off-site.Located entirely on property which is not included within the bounds of the plat being considered for impact fee assessment.
On-site.Located at least partially on the plat which is being considered for impact fee assessment.
Plat.Has the meaning given in the city's subdivision regulations. The term "plat" includes replat, exclusive of amending plats as defined under V.T.C.A., Local Government Code section
212.016.
Platting.Has the meaning given in the city's subdivision regulations. Platting includes replatting.
Recoupment.The imposition of an impact fee to reimburse the city for capital improvements which the city has previously oversized to serve new development.
Service area.The entire area within the corporate limits of the city within which impact fees for capital improvements or facility expansion will be collected for new development occurring within such area and within which fees so collected will be expended for those types of improvements or expansions identified in the type of impact fee capital improvements plan applicable to the service area.
Service unit.A three-quarter-inch water meter, assumed to provide a yearly average of 405 gallons of water per day for consumption by one single-family dwelling unit, and which may be equated to consumption by other land uses, as established in the land use equivalency tables, attached to Ordinance No. 95-702 as exhibit B and incorporated by reference in this article, as may be amended from time to time.
Site-related facility.An improvement or facility which is for the primary use or benefit of a new development or group of new developments and/or which is for the primary purpose of safe and adequate provision of water or wastewater facilities to serve the new development, and which is not included in the impact fee capital improvements plan, provision for which the property owner or group of owners is solely responsible under subdivision or other applicable regulations.
Utility connection.Authorization to install a water meter for connecting a new development to the city's water system or to the city's wastewater system.
Wastewater facility.An improvement for providing wastewater treatment or collection service, whether or not located within the service area, including, but not limited to, treatment plants, interceptors or mains, lift stations or other facilities included within and comprising an integral component of the city's treatment and collection system for wastewater. "Wastewater facility" includes land, easements or structures associated with such facilities. "Wastewater facility" excludes a water line or main which is constructed by a developer, the costs of which are reimbursed from charges paid by subsequent users of the facilities. "Wastewater facility" excludes a site-related facility.
Water facility.An improvement for providing water supply, treatment and distribution service, whether or not located within the service area, including, but not limited to, water treatment and conveyance facilities, water interceptors or mains, pump stations, storage tanks or other facilities included within and comprising an integral component of the city's water treatment, storage or distribution system. "Water facility" includes land, easements or structures associated with such facilities. "Water facility" excludes a water line or main which is constructed by a developer, the costs of which are reimbursed from charges paid by subsequent users of the facilities. "Water facility" excludes site-related facilities.
Water meter.A device owned by the city for measuring the flow of water to a development, whether for domestic or for irrigation purposes.
(1999 Code, sec. 70-37)