[ORDINANCE 10-08-24A[1]]
AN ORDINANCE OF THE CITY OF HORSESHOE BAY ESTABLISHING THE MARINA CLUB AT APPLEHEAD ISLAND PLANNED DEVELOPMENT DISTRICT; ADOPTING PLANNED DEVELOPMENT REGULATIONS FOR THE PLANNED DEVELOPMENT DISTRICT (PD); ESTABLISHING BOUNDARIES FOR THE PD; AMENDING THE ZONING MAP; ENACTING CERTAIN DEVELOPMENT STANDARDS AND LAND USE REGULATIONS; SETTING OUT ADMINISTRATIVE AND LEGISLATIVE PROCEDURES; IMPOSING CIVIL AND CRIMINAL PENALTIES, INCLUDING FINES NOT TO EXCEED $2,000 PER OFFENSE; PROVIDING APPROVAL AUTHORITY FOR THE CITY COUNCIL; PROVIDING FOR ENFORCEMENT AND PENALTIES, AND PROVIDING FOR REPEALER, SEVERABILITY AND AN EFFECTIVE DATE.
WHEREAS, the City Council of the City of Horseshoe Bay (“City Council”) seeks to continue to provide for the health, safety, and welfare of those living in, working in, and visiting the City; and
WHEREAS, Chapter 14 Zoning of the City Code Zoning Chapter establishes reasonable land use regulations within the City, including the use of Planned Developments (“PDs”), particularly to meet unique development needs of certain projects; and
WHEREAS, Article 14.02, Division 4 of Chapter 14 Zoning of the City Code Zoning Chapter specifies the procedure and requirements for the creation of PDs, and permits development of land as an integral unit for single or mixed use in accordance with a PD Concept Plan and in which the goals and objectives of the Comprehensive Plan are to be implemented; and
WHEREAS, the owner and developer, AHI Marina Club, LP (the “Developer”), proposes development of property in the City in a manner that includes unique needs and for which a Conceptual Site Plan (the “Concept Plan”), attached hereto as Exhibit “A,” and incorporated herein for all purposes, contains proposed development standards for a PD; and
WHEREAS, Article IX [Article 10.03, Division 9] of the City’s Subdivision Ordinance describes Planned Development Districts (“PD”), which permit a combination of dwelling types and/or a variety of land uses which creatively complement each other; and
WHEREAS, a statement of how the PD will relate to the City’s Comprehensive Plan has been submitted in compliance with the requirements of Section 6; and
WHEREAS, the property proposed for inclusion in such PD is approximately 11 acres comprised of Lots 200, 202, 204, 206, 208, 210, 212, 214, 216 and 218 and Lots 300 through 312, inclusive, Horseshoe Bay Applehead Island in the City of Horseshoe Bay, in Llano County, Texas; and
WHEREAS, the City has examined such Concept Plan and all accompanying documents and is of the opinion that the proposed PD is in compliance with Division 4 of Chapter 14 Zoning of the City Code and that a PD should be created and be identified hereinafter as The Marina Club at Applehead Island PD of the City of Horseshoe Bay; and
WHEREAS, Public notice was provided and the City Council has conducted a public hearing on creation of The Marina Club at Applehead Island PD, as required by law; and
WHEREAS, the City Council, in the exercise of its legislative discretion has concluded that Chapter 14 Zoning of the City of Horseshoe Bay Code of Ordinances should be amended as herein described.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF HORSESHOE BAY:
[1]
Editor’s note–The planned development ordinance, Ordinance 10-08-24A, adopted by the city on August 24, 2010, is published herein as exhibit H. Due to the nature of this ordinance and the technicalities involved in adopting or amending it, such ordinance is printed herein as enacted, with only nonsubstantive formatting and style changes. Capitalization, punctuation and numbering of articles, sections and subsections have been retained as enacted. Subsequent amendments will be inserted in their proper place and denoted by a history note following the amended provisions. The absence of a history note indicates the material is unchanged from the original. Obviously misspelled words have been corrected without notation. Any other material added for purposes of clarification is enclosed in brackets. All exhibits to this ordinance referenced herein are on file in the office of the city secretary.
All of the above premises are hereby found to be true and correct legislative and factual findings of the City Council, and are hereby approved and incorporated into the body of this Ordinance as if copied in their entirety.
Chapter 14 Zoning of the City of Horseshoe Bay, Texas Code of Ordinances as heretofore amended, be and the same is hereby amended by adding a new Planned Development Zone, “The Marina Club at Applehead Island PD” as more fully set forth herein. This Ordinance amends the City’s Zoning Chapter but shall stand alone and shall be complementary to rather than supplanting or replacing portions of such Zoning Chapter.
The Property shall be regulated for purposes of zoning and subdivision by the City Code’s Zoning and Subdivision Chapters, and shall be subject to all other City Codes and Ordinances in effect except as herein specifically provided. Particular zoning classifications are set forth in this PD Ordinance. Where a general zoning item is not specifically addressed in this PD Ordinance but is addressed by the City’s Zoning Chapter or other Code or Ordinance in effect, the Zoning Chapter or other Code or Ordinance shall control. In the event of any conflict between this PD Ordinance and the City’s Zoning Chapter, this PD Ordinance shall control. Where a general subdivision matter is not specifically addressed in this PD Ordinance but is addressed by the City’s Subdivision Chapter or other Ordinance in effect, the Subdivision or other Ordinance shall control. In the event of any conflict between this PD Ordinance and the City’s Subdivision Ordinance, this PD Ordinance shall control.
Bar
means any use that must obtain approval of any of the Texas Alcoholic Beverage Commission Permits or Licenses.
City Council
means the City Council of the City of Horseshoe Bay, Llano and Burnet Counties, Texas.
Developer
means AHI Marina Club, LP and shall include any person, partnership, firm, association, corporation (or combination thereof), and/or any officer, agent, employee, servant and trustee thereof who performs or participates in the performance of any act toward the subdivision and/or development of land within the intent, scope and purview of this PD Ordinance. Developer shall also be defined as the builder if it is responsible for the construction of buildings and/or other structures or permanent improvements.
Estate Lot or Estate Lots
means those Lots zoned R-1E; more specifically, Lots 200, 202, 204, 206, 208, 210, 212, 214, 216, and 218.
Horseshoe Bay Applehead Property Owners Association (“HSBAPOA”)
means the Horseshoe Bay Applehead Property Owners Association.
“Horseshoe Bay Applehead Island Committee of Architecture” (“HSBAICA”)
means the Committee for architecture for Horseshoe Bay Applehead Island.
Horseshoe Bay Applehead Island Property Owners Association (“HSBAIPOA”)
means the Property Owners Association for Horseshoe Bay Applehead Island.
Lot or Lots
means Lots 200, 202, 204, 206, 208, 210, 212, 214, 216, 218 and Lots 300 through 312, inclusive, Horseshoe Bay Applehead Island in the City of Horseshoe Bay, Llano County, Texas.
Night Club
means a commercial operation that provides music for dancing or entertainment and may include a Bar; it specifically excludes a private noncommercial party within the amenity center.
PD
means a Planned Development under the City’s Zoning Chapter.
PD Concept Plan
means the Concept Plan that establishes the general guidelines for the PD by identifying the proposed land uses and intensities, thoroughfare locations, and open space boundaries and illustrates the integration of these elements into a master plan for the entire PD, a copy of which is attached hereto as “Exhibit A” and incorporated herein for all purposes.
Project
means “The Marina Club at Applehead Island” neighborhood mixed use development, discussed more fully in the PD Concept Plan.
Property
means the approximately 11 acres of land which is owned by Developer and currently located within the corporate boundaries of the City and more fully described as comprised of Lots 200, 202, 204, 206, 208, 210, 212, 214, 216, 218 and Lots 300 through 312, inclusive, Horseshoe Bay Applehead Island in the City of Horseshoe Bay, Llano County, Texas, and is intended to be developed as the Project.
The Marina Club at Applehead Island Property Owners Association (“MCAIPOA”)
means the new property owners association created for the Project, regardless of its official name.
Villa Lot or Villa Lots
means those Lots zoned R-1; more specifically, Lots 300 through 311, inclusive.
(a) 
Standards. The Project shall be zoned in three classifications in Zone 1 Applehead Island: R-1E Single Family Estate, R-1 Single Family Residential and A-1 Recreational. The provisions of Sections 14.02.402 and 14.02.404 of the Zoning Chapter shall apply to the Project except for the following modifications; and so long as the Project is constructed consistent with the Concept Plan, the restrictions and standards described in Sections 14.02.402 and 14.02.404 of the Zoning Chapter are amended for The Marina Club at Applehead Island PD as follows:
(1) 
Zoning: Unless otherwise modified by this PD Ordinance, rules presently pertaining to Classification R-1 and A-1 in Zone 1 Applehead Island apply to the development of the Property; unless otherwise modified by this PD Ordinance, rules presently pertaining to Classification R-1 in Zone 1 Applehead Island apply to the R-1E areas of the Property. All main residences within R-1E shall contain a minimum of 4,000 square feet of air conditioned, livable space; all main residences within R-1 shall contain a minimum of 3,000 square feet of air conditioned, livable space. The following Lots are hereby zoned as follows:
(A) 
Lot 200 from R-2 to R-1E;
(B) 
Lots 202, 204, 206, 208, 210, 212, 214, 216 & 218 from R-1 to R-1E;
(C) 
Lots 300 - 311 from R-2 to R-1;
(D) 
Lot 312 from R-2 to A-1;
(E) 
A-1 zoned property south of Lots 300, 302, 304, 306, 308, 310 and 312 from A-1 to R-1;
(2) 
Setbacks: All buildings shown on the PD Concept Plan shall be required to have setbacks as shown on the PD Concept Plan.
(3) 
Walls:
(A) 
Developer shall provide the HSBAIPOA with engineer certified plans for the construction of the perimeter wall to be constructed adjacent to a portion of Fault Line Drive and thence continuing along the southern edge of the Project up to Applehead Island Drive (the “Perimeter Wall”). The Perimeter Wall shall be of solid rock which matches the appearance of existing rockwork on Applehead Island, except for segments to be a combination of rock and wrought iron as mutually agreed by Developer and HSBAIPOA. The Perimeter Wall shall have a minimum height of eight feet (8').
(B) 
Walls shall be constructed between the Lots along the Common Wall Easement and along the rear of each Lot as shown on the Concept Plan. Furthermore, walls shall be constructed on the front of each Estate Lot.
(C) 
Walls shall be constructed along the front of each Estate Lot, shall be no less than fifteen (15) feet from the front property line of such Lot, shall have a height not greater than eight feet (8') nor have a height lower than seven feet (7'), and shall run level on a horizontal plane (“Frontal Walls”). Frontal Walls shall have incorporated therein an entry gate that provides access to the residences located on such Lot. The required entry gate shall not consist of solid rock or other solid construction material, but shall be of construction that allows visibility through the gate.
(D) 
All walls constructed on any Lot must be approved by the HSBAICA as to height, design, materials, color and type of construction and any walls adjacent to streets shall be open design comprising stone and wrought iron, with at least eighty percent (80%) being open (wrought iron) on Applehead Island Drive and at least sixty percent (60%) open on Dominion Drive. Notwithstanding the provisions described in this Section V(a)(3), all walls constructed along the front of each Lot fronting Island Court shall have a height not greater than five feet (5') nor have a height lower than four feet (4') and shall run level on a horizontal plane and further, there will be no required entry gates for the Lots fronting on Island Court.
(E) 
All walls shall be stone laid in a pattern approved by the HSBAICA; neither wood nor stucco are permitted; and
(F) 
All entry gate design and construction shall be approved by the HSBAICA.
(4) 
Accessory Buildings: Within the R-1E classification:
(A) 
Accessory buildings to be used for residential purposes are limited to one story and twenty-five (25) feet in height; and
(B) 
Accessory buildings are not required to be attached to the principal residence on the Lot.
(5) 
A-1 Classification: In addition to the uses allowed in Zone 1, classification A-1 Recreational, Lot 312 of the Project which is classified as A-1, may be used for a marina and an amenity center as shown on the Concept Plan. The permitted uses will include, boat and recreational water sports, boat slips and storage, a swimming pool, a clubhouse with meeting rooms, cabanas, patios/garden, decks, pavilions, an identification tower, a mooring dock, jet ski storage and launch, a parking area, boat slips, a storage building, and a waterfall curtain.
(6) 
The Project shall meet all requirements of the Lower Colorado River Authority.
(7) 
The following items shall be applicable to the Project, at Developer’s sole cost and expense:
(A) 
Provide landscaping along the west side of Fault Line Drive as shown on the Concept Plan and submit landscaping plans to the HSBAICA for approval prior to commencing landscaping.
(B) 
There is to be no Bar or Night Club within the Project.
(C) 
Developer agrees to install such water and wastewater lines as required to accommodate the Project, irrigation (with back flow preventer valve) and new fire hydrants, all where applicable.
(D) 
Upon receiving the approval of, and authorization from, all applicable governmental and regulatory authorities, Developer will comply with all requirements for dredging of the area within Lot 312 as shown on the Concept Plan. Developer will submit all applicable permits and authorizations to the City prior to commencing any dredging operations. Developer will reconstruct a portion of Fault Line Drive that is contiguous to Lot 312 so as to build a bridge/roadway over a waterway to be created that will connect the Project to Lake Lyndon B. Johnson. The City shall review and approve all Developer submitted design, construction and engineering plans prior to commencing any construction activities. The City shall approve all of the plans and specifications related to the bridge/roadway and the waterway area; construction shall be completed in accordance with the bonding requirements of Section V(a)(7)(F). The bridge/roadway shall be deeded to the City when Developer has completed its construction and same has been accepted by the City. Water features shall not be deeded to or maintained by the City.
(E) 
Phasing of Construction: Construction of the marina, amenity center, bridge/roadway and the Perimeter Wall is intended to be in one (1) phase and any deviation from this shall be approved by City Council. Developer shall obtain from the City (i) the infrastructure permit for the bridge/roadway, (ii) the recreational amenity permit, (iii) the cut and fill permit and (iv) the Perimeter Wall permit, all within one (1) year from the date of adoption of this PD Ordinance. Once a Building Permit is obtained, if there is any lag of construction for more than forty-five (45) days, then the City shall, at its sole option, either complete construction or clean up the Property, as permitted under the bonding section.
(F) 
Bonding: To ensure timely completion, prior to commencing any work on the bridge/roadway, the dredging, the marina and amenity area or the Perimeter Wall, Developer will furnish or cause to be furnished such performance and labor and material payment bonds with corporate sureties licensed to do business in Texas and in amounts and with terms satisfactory to the City. The City shall either be a co-obligee under such bonds or such bonds shall be assigned to, or made for the benefit of, the City as shall be satisfactory to the City. Unless the City Council determines a lesser amount, the amount of the bond shall be equal to the estimated cost of completion of all construction and road restoration as described in Section V(a)(7)(K) below, plus ten percent (10%), to cover future cost increases required to complete the Project, or clean up, restore and landscape the Project site if construction is not to be completed. The bonds shall be submitted to the City Council with the first Building Permit and the approval of the bonds is a condition to the issuance of Building Permits for the Project. In the event any or all of the improvements for the marina and the amenity area, the dredging and/or the bridge/roadway, fail to meet the requirements of the approved plans and specifications, or Developer fails to begin construction or refuses to correct the defects called to its attention by the City, the unfinished improvements shall be completed at the cost and expense of Developer. The City may draw on the bonds and pay the cost of completing the unfinished improvements if the City determines that the Developer has breached the obligations secured by the bonds or the forty-five (45) day time period for a pause in the construction of all required improvements has expired. Depending on the extent of construction at the time of the forty-five (45) day pause, the City may decide to clean up, restore and landscape the construction site or complete the construction. The City shall refund the balance of the bonds, if any, to Developer. Developer shall be liable for all costs that exceed the amount covered by the bonds, if any. Notwithstanding anything contained in this Section V(a)(7)(F) to the contrary, the City reserves the right to accept other forms of surety to secure the payment and performance of the construction work herein described.
(G) 
Developer shall reimburse the City for all costs incurred by the City relating to the Project per the City’s Development Policy.
(H) 
A timeline for the Project, with milestones, as shown on the attached Exhibit B. Exhibit “B” is intended to provide a sequence of construction events and the duration thereof. The start and end dates contained in Exhibit “B” are included for convenience only, and do not bind the Developer to begin or end construction for items on the respective dates contained therein. However, Developer shall remain obligated to comply with all dates and deadlines contained in the PD subject to the force majeure provisions contained in Article VI.
(I) 
A plan to show how the Project’s perimeter will be secured at all times during construction.
(J) 
Developer’s contractors shall observe strict adherence to Applehead Island established work hours and days (Monday - Friday from 8 AM to 6 PM; Saturday from 9 AM to 6 PM; and no work on Sundays, holidays, or holiday weekends) unless other work hours are approved by the HSBAIPOA; provided, however, during the construction of the bridge/roadway, the hours for bridge/roadway construction will be Monday - Saturday 7 AM to 7 PM.
(K) 
All construction vehicle, equipment and hauling traffic relating to the Project will be coordinated with the City staff. Developer will be required to restore all roads damaged by such traffic to their condition immediately prior to the commencement of such and additionally, Developer shall institute and complete interim repairs as damage occurs from time to time during the construction of the Project.
(L) 
Developer’s contractors shall not stockpile any excavation material on the Property.
(M) 
Developer shall provide a temporary construction entrance from Fault Line Drive or Nichola Gay for all machinery, hauling and workers. The entrance is to be guarded during work hours and securely locked during off hours. Developer shall provide a temporary perimeter security fence inbound of the marina development area.
(N) 
Developer and the MCAIPOA shall indemnify and hold the City and the HSBAIPOA harmless from any and all claims, actions, damages, losses, and injuries, including, but not limited to attorneys fees, relating to the proposed water curtain at the Project’s water entrance.
(O) 
Developer shall install all required fire hydrants per the current City Fire Code.
(P) 
Developer shall install fire sprinklers throughout the amenity center pursuant to any applicable fire codes and regulations; or, in lieu thereof, Developer shall provide adequate access from more than one side of the amenity center to the appropriate fire authorities, including the City’s Fire Department.
(Q) 
Developer shall indemnify and hold the City, the HSBAPOA and the HSBAIPOA harmless from any and all claims, actions, damages, losses, and injuries, including, but not limited to attorneys fees, relating to the Project’s construction or ongoing operation.
(R) 
The HSBAICA shall review and approve all Developer submitted design drawings and final construction documents of all improvements relating to the marina and amenity center, including colors, materials, dimensions and lighting prior to installation.
(S) 
The City will have the authority to direct and/or divert all construction traffic for safety reasons and so as to minimize detrimental affects upon the roads. Additionally, until otherwise notified by the City, all trucks, trailers and equipment used to haul materials to and from the Project shall use the route shown on Exhibit “C” attached hereto and incorporated herein for all purposes.
(b) 
Activities During Construction. Developer shall ensure that the following items are addressed and/or enforced during construction on the Project:
(1) 
Developer shall at all times provide parking for vehicles involved in the Project on the Property. Construction vehicles shall not be allowed to park on the streets. The City’s Parking Article (Article 12.03) must be followed during construction.
(2) 
Developer shall ensure that all construction activities do not interfere with any existing residential uses on adjoining and nearby tracts.
(3) 
Developer shall provide construction of a suitable temporary road for use during bridge construction. Construction of the bridge on Fault Line Drive shall be planned to ensure normal traffic flow is maintained, by use of a detour onto Lot 312. All plans and specifications of the temporary road shall be submitted to, and approved by, the City prior to commencing any construction of such road. Developer shall restrict (i) bridge/roadway and dredging construction traffic, (ii) dredging construction traffic, (iii) marina construction traffic and (iv) Perimeter Wall construction traffic so as to avoid the use of Applehead Island Drive. This prohibition does not apply to residential construction on residential Lots including construction of walls upon Lots as provided in Section V(a)(3) above. Developer shall also provide for a construction entrance on Fault Line Drive or Nichola Gay and a staging area on the Project site, to keep vehicles off of the street. Developer shall coordinate with the City should it become necessary to block any public roadways during construction to ensure that all traffic congestion problems are minimized.
(4) 
Developer shall ensure that all environmental protection measures are undertaken and all required controls are in place to minimize runoff.
(5) 
Developer shall ensure that all construction debris is properly contained and disposed of and that dust from the construction activities is minimized.
In the event that either party shall be delayed or hindered in or prevented from the performance of any covenant, agreement, work, service, or other act required under this PD Ordinance to be performed by such party (a “Required Act”), and such delay or hindrance is due to causes entirely beyond its control such as riots, insurrections, martial law, civil commotion, war, fire, flood, earthquake, or other casualty or acts of God (a “Force Majeure Event”), then the performance of such Required Act shall be excused for the period of delay, and the time period for performance of the Required Act shall be extended by the same number of days in the period of delay. A Force Majeure Event shall not be deemed to commence until the ten (10) days before the date on which the party who asserts some right, defense or remedy arising from or based upon such Force Majeure Event gives written notice thereof to the other party hereto. If abnormal adverse weather conditions are the basis for a claim for an extension of time due to a Force Majeure Event, the written notice shall be accompanied by data substantiating (i) that the weather conditions were abnormal for the time and could not have been reasonably anticipated and (ii) that the weather conditions complained of had a significant adverse effect on the performance of a Required Act. To establish the extent of any delay to the performance of a Required Act due to abnormal adverse weather, a comparison will be made of the weather for the time of performance of the Required Act with the average of the preceding ten (10) years climatic range based on the National Weather Service statistics for the nearest weather reporting station to the Premises. No extension of time for or excuse for a delay in the performance of a Required Act will be granted for rain, snow, wind, cold temperatures, flood or other natural phenomena of normal intensity for the locality where the Premises are located.
To the extent not otherwise modified by the provisions contained in this PD Ordinance, the provisions for civil and criminal penalties, including a fine of up to $2,000.00 per day of violation, contained in Section 5 [Article 14.02, Division 5], Penalties and Enforcement of the City’s Zoning Chapter, as it may be amended in the future, pertain to The Marina Club at Applehead Island PD. The Property shall be used only in the manner and for the purposes provided for in Chapter 14 Zoning of the City Code as hereby amended by this PD Ordinance and as the Zoning Chapter may be amended in the future. If Developer does not apply for the building permits for the Project within twelve (12) months from the date this Ordinance is adopted, this Ordinance, the Concept Plan and the project on this property are null and void, and the Zoning District Map will need to be so amended to reflect the reversal of the zoning change.
The official Zoning District Map of the City of Horseshoe Bay hereto adopted be and is hereby amended to reflect the zoning changes made herein.
If any section, subsection, sentence, phrase, word, paragraph or provision of this PD Ordinance be found to be illegal, invalid or unconstitutional, for any reason whatsoever, the adjudication shall not affect any other section, subsection, sentence, phrase, word, paragraph or provision of this PD Ordinance or the application of any other section, subsection, sentence, phrase, word, paragraph or provision of any other Ordinance of the City. The City Council declares that it would have adopted the valid portions and applications of this PD Ordinance and would have rezoned the Property without the invalid part, and as to this end the provisions of this PD Ordinance are declared to be severable.
This PD Ordinance shall be in full force and effective from and after its date of passage, in accordance with law.