[1]
Editor's note–Former article 20.000 pertaining to similar subject matter, was amended by Ordinance 2026-02-01039 adopted 2/5/2026. Prior to the replacement this article derived from the following: Ordinance 2017-08-00864 adopted 8/17/17; Ordinance 2023-02-00970 adopted 2/16/2023; Ordinance 2023-09-00991 adopted 9/21/2023; Ordinance 2024-05-01003 adopted 5/2/2024.
Effective date
3/1/26
10/1/26
10/1/27
10/1/28
10/1/29
5/8"
$29.17
$30.92
$32.78
$34.74
$36.83
1" meter
$43.76
$46.39
$49.17
$52.12
$55.25
1 1/2" meter
$72.93
$77.31
$81.94
$86.86
$92.07
2" meter
$145.86
$154.61
$163.89
$173.72
$184.14
3" meter
$466.74
$494.74
$524.43
$555.89
$589.25
4" meter
$729.28
$773.04
$819.42
$868.58
$920.70
Consumption charge
0 to 10
$5.96
$6.32
$6.70
$7.10
$7.52
10 to 25
$7.94
$8.42
$8.92
$9.46
$10.02
25 to 50
$9.93
$10.53
$11.16
$11.83
$12.54
50 to 75
$11.91
$12.62
$13.38
$14.19
$15.04
75+
$15.88
$16.83
$17.84
$18.91
$20.05
(Ordinance 2026-02-01039 adopted 2/5/2026)
Effective date
3/1/26
10/1/26
10/1/27
10/1/28
10/1/29
5/8
$29.17
$30.92
$32.78
$34.74
$36.83
1" meter
$43.76
$46.39
$49.17
$52.12
$55.25
1 1/2" meter
$72.93
$77.31
$81.94
$86.86
$92.07
2" meter
$145.86
$154.61
$163.89
$173.72
$184.14
3" meter
$466.74
$494.74
$524.43
$555.89
$589.25
4" meter
$729.28
$773.04
$819.42
$868.58
$920.70
Consumption charge
Per 1,000 gallons
$9.44
$10.01
$10.61
$11.24
$11.92
(Ordinance 2026-02-01039 adopted 2/5/2026)
Effective date
3/1/26
10/1/26
10/1/27
10/1/28
10/1/29
5/8"
$43.76
$46.38
$49.16
$52.11
$55.24
1" meter
$65.64
$69.58
$73.75
$78.18
$82.87
1 1/2" meter
$109.40
$115.96
$122.92
$130.29
$138.11
2" meter
$218.79
$231.92
$245.83
$260.58
$276.22
3" meter
$700.11
$742.12
$786.64
$833.84
$883.87
4" meter
$1,093.92
$1,159.56
$1,229.13
$1,302.88
$1,381.05
Consumption charge
0 to 10
$8.93
$9.48
$10.04
$10.65
$11.29
10 to 25
$11.91
$12.62
$13.38
$14.19
$15.04
25 to 50
$14.89
$15.79
$16.74
$17.74
$18.80
50 to 75
$17.87
$18.94
$20.07
$21.28
$22.55
75+
$23.82
$25.25
$26.76
$28.37
$30.07
(Ordinance 2026-02-01039 adopted 2/5/2026)
Out-of-city rates shall be calculated as:
(1) 
Minimum charge: 1.5 times in-city rate.
(2) 
Volumetric rate per thousand gallons: 1.5 times in-city rate.
(Ordinance 2026-02-01039 adopted 2/5/2026)
(a) 
1" meter: $2,100.00.
(b) 
2" meter: $4,200.00.
(c) 
3" meter: $6,300.00.
(d) 
4" meter: $8,400.00
(e) 
Tap: $1,350.00.
(f) 
Standard bore: $1,350.00.
(g) 
Nonstandard bore: Cost + 20%.
(h) 
Reread: $25.00.
(i) 
Disconnect water service: $25.00.
(j) 
Reconnect water service: $25.00.
(k) 
Late fee: $25.00.
(l) 
NSF returned check: $25.00.
(m) 
Meter tampering: $500.00.
(n) 
Meter testing: $500.00 (fee charged if found to be accurate within 3%. No charge if inaccurate).
(o) 
Replacement for damaged meter: $600.00.
(p) 
Fire hydrant meter deposit: $1,500.00 (includes backflow preventer + rental and water).
(q) 
Fire hydrant monthly rental: $50.00.
(r) 
Fire hydrant meter water usage (per current water rate schedule): Current rate.
(s) 
Required deposit for in-city water service: $100.00.
(t) 
Required deposit for out-of-city water service: $125.00.
(u) 
Water meter upgrade 3/4" to 1": $600.00.
(v) 
Water meter upgrade 3/4 or 1" to 2": $1,200.00.
(Ordinance 2026-02-01039 adopted 2/5/2026)
During a stage 3 or stage 4 drought response stage, water used in excess of 25,000 gallons per month will be billed a $3.50 surcharge per 1,000 gallons as set forth in the city's drought contingency.
(Ordinance 2026-02-01039 adopted 2/5/2026)