In all areas of special flood hazard, the following provisions are required:
(1)
All new construction and substantial improvements shall be anchored to prevent flotation, collapse or lateral movement of the structure.
(2)
All new construction or substantial improvements shall be constructed by methods and practices that minimize flood damage.
(3)
All new construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage.
(4)
All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system.
(5)
New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the system and discharges from the system into floodwaters.
(6)
On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding.
(2002 Code, sec. 151.20)