For the purpose of this article, the following definitions shall apply, unless the context clearly indicates or requires a different meaning:
Acre-foot.The volume of space equivalent to 12 inches (one foot) of water on one acre of land.
Detention facilities.Include but are not limited to basins, ponds, restricted-outlet ditches, depressed grading and/or paving, pipes, channels, and floodplains that cause rainfall runoff to leave an area more slowly than it otherwise would.
Development.All construction on land that creates new surface disturbances that result from filling, excavating or surfacing activities on the land. For purposes of this article, “development” does not include adding a floor to a building, building on an existing slab, replacing an existing slab, replacing an existing slab or pavement with a new slab or pavement of the same size at existing grades, or other activities that do not change the amount of impervious cover on the land or the grades of said land or surfaces.
Development permit.A formal document, approved by the city engineer or his or her designee, issued by the city, permitting construction of the project applied for, including but not limited to a building permit, development permit, approved and signed construction plans and specifications, or developer agreement.
Equivalent impervious area.The area of impervious land equal in new runoff potential to a mixture of pervious and impervious land that is larger in total area.
Flood or flooding.A general and temporary condition of partial or complete inundation of normally dry land area.
Impervious areas.Areas of land or other surfaces that intercept rainfall, preventing it from being absorbed into that surface.
Local detention.A detention feature built within the property lines of a proposed or existing development for the purpose of mitigating only the developed runoff from that development.
Mitigation.Employment of physical or management means of limiting the impact of development upon the existing surroundings; limiting the effects of increased runoff due to development activities.
Official benchmark.Any formally installed monument placed at a known elevation above mean sea level in reference to the NAD 83 State Plane Coordinate System that is accepted by the city. Monument locations will be provided by the city engineering department.
Public drainageway.Any channel, pipe, ditch, swale, street, paved way, creek, or river which clearly lies within the public domain as a legal right-of-way, easement, public fee title in agency having jurisdiction, or historically incontestable public prescriptive right, and which bears no reasonable risk of individual private proscription.
Regional detention.Detention that is effective over an area of land that includes more than one development project.
Replacement detention.Detention of developed runoff at a site other than the site responsible for increasing runoff.
Special flood hazard area.The land in the floodplain within a community subject to a 1% chance of flooding in any given year, according to published national flood rate insurance maps.
Water surface elevation.The height above mean sea level, in relation to the NAD 83 State Plane Coordinate System (or any other datum specified), of floods of various magnitudes.
(1995 Code, sec. 150.188; Ordinance 3323 adopted 6/16/1998)