The fee for said permit shall be two (.02) cents per square foot per month, or fractional part of a month; provided that the minimum permit shall be one ($1.00) dollar.
(1986 Municipal Code, Title 5, Chapter 1, Section 5-1-7)
Each applicant for examination as master journeyman electrician shall, at the time of filing his application pay to the secretary of the board the sum of three dollars ($3.00), said fee to be turned over to the city secretary.
Each applicant for master electricians license shall pay to the secretary and treasurer $25.00 which shall cover the privilege therein granted for the period of one year, and thereafter there shall be charged an annual license fee to such person, firm or corporation who has previously received a license as herein provided, an annual license fee of $5.00 provided however, any renewal license shall be applied for by applicant within 10 days after expiration of any existing license.
Provided further that each applicant for license as master electrician shall execute an approved surety bond to the city in the amount of one thousand dollars conditioned upon the strict compliance with the requirements of this code.
Anyone qualifying as journeyman electrician as specified in this article shall pay to the secretary and treasurer $3.00 for such license for a period of one year.
The fee to be paid for the special license for the one job for the master electricians shall be forty-five and no/100 ($45.00) dollars. In addition, if the master electrician receiving a special permit desire to use journeyman electricians who are not licensed by the city, but who are licensed by some other town, the journeyman electricians may receive a special license for one job by paying therefor a fee of five and no/100 ($5.00) dollars.
No person, firm, or corporation, shall begin any work of installing, erecting or altering material, wiring, fixtures, or other apparatus to be used for the generation, transmission and utilization of electricity for light, heat and power in or on any buildings or premises in the city without first securing a permit, therefor from the electrical inspector, said permits to cost twenty cents ($0.20) per square foot.
(1986 Municipal Code, Title 5, Chapter 3, Section 5-3-3; Ordinance 532, sec. I, adopted 9/8/15)
No person, firm or corporation, shall begin any work of installing or altering material, fixtures or other apparatus to be used for the purpose of plumbing in or on any buildings or premises in the city without first securing a permit, therefor from the plumbing inspector, said permits to cost a fee of twenty cents ($0.20) per square foot.
The total fees for inspection of consumer’s gas piping at one location (including both rough and final piping inspection) shall be $1.50 for one to four outlets, inclusive, and $0.50 for each outlet above five.
In addition to the above fees for moving, a fee of five dollars ($5.00) will be charged for each day in excess of one day that the building obstructs any street or alley.
(Ordinance 532, sec. III, adopted 9/8/15; 1986 Municipal Code, Title 5, Chapter 8, Section 5-8-1)
The cost of a building permit fee shall be twenty cents ($0.20) per square foot.