(a) 
Individual meters.
The rates to be charged customers inside and outside the city limits for water furnished through an individual meter by the water system of the city are established in the city's adopted fee schedule.
(b) 
Master meters.
Each location metered through a master meter shall have a minimum charge assigned to each occupied space each month with the cumulative gallons allowed therewith as covered by such charges. All gallons above the accumulative base minimums will be billed as established in the city's adopted fee schedule.
(Ordinance adopted 11/15/05, secs. I, II; Ordinance adopted 10/15/19; Ordinance 09-2022C adopted 9/20/2021)
Water production fees are being assessed by the Post Oak Savannah Groundwater Conservation District for water produced by city water wells. A surcharge will be levied per one thousand (1,000) gallons of water flowing through each customer meter for these conservation district production fees. Said surcharge will appear as a separate line item on the monthly water bill.
(Ordinance 031803, sec. I, adopted 3/18/03)
(a) 
The charges for tapping of water main, extension of services from main to property line location of meter, and installation of meter, provided said distance does not exceed fifty (50) feet is established in the city's adopted fee schedule.
(b) 
Tap services requiring distances greater than fifty (50) feet and all taps above 1" diameter will be at actual costs (labor and material).
(Ordinance adopted 10/15/19; 1989 Code, ch. 10, sec. 3; Ordinance 09-2022C adopted 9/20/2021)