(a)
Reconnect - Business hours:
$50.00 (nonpayment).
(b)
Reconnect - Nonbusiness hours:
$100.00 (nonpayment).
(c)
Late penalty:
20%.
(e)
Commercial deposits:
(1)
5/8" and 3/4" meter: $150.00/$200.00 ($150.00 water/$200.00 water and sewer).
(2)
1" meter: $150.00/$200.00 ($150.00 water/$200.00 water and sewer).
(3)
1-1/2" meter: $150.00/$200.00 ($150.00 water/$200.00 water and sewer).
(4)
2" meter: $150.00/$200.00 ($150.00 water/$200.00 water and sewer).
(5)
3" meter: $150.00/$200.00 ($150.00 water/$200.00 water and sewer).
(6)
4" meter: $150.00/$200.00 ($150.00 water/$200.00 water and sewer).
(7)
6" meter: $150.00/$200.00 ($150.00 water/$200.00 water and sewer).
(8)
8" meter: $150.00/$200.00 ($150.00 water/$200.00 water and sewer).
(9)
10" meter: $150.00/$200.00 ($150.00 water/$200.00 water and sewer).
(f)
Water tap fees:
Cost + 25% (actual cost of meter, related materials and labor plus 25%).
(g)
Other meter related fees:
(1)
Meter testing - Residential: $80.00; free if meter is not accurate within +/-2% margin.
(2)
Meter testing - Nonresidential: $80.00; free if meter is not accurate within +/-2% margin.
(3)
Move water meter: Actual cost.
(4)
Tampering charge: $125.00 + cost ($500.00 + actual repair cost). [sic]
(5)
Removal of unauthorized tap: 25% + cost ($500.00 + actual repair cost).
(6)
Water turn on/off fees - Residential: $30.00.
(7)
Water turn on/off fees - Nonresidential: $50.00.
(8)
Debit/credit card charges: Actual cost.
(9)
Returned check fee: $35.00.
(10)
Service transfer fee: $25.00.
(11)
Cost of sewer line extensions, including materials and labor [see article 12.04 of the Code of Ordinances].
(12)
Backflow prevention assembly test: $200.00 each separate test.
(13)
Backflow prevention assembly retest: $100.00 each retest.
(14)
Annual registration fee for approved testers: $75.00 annually.
(15)
Annual device registration fee: $25.00 per each.
(16)
Deposit fee for fire hydrant water meter with backflow prevention: $1,750.00 per each.
(17)
Meter installation - 1": $550.00.
(18)
Inspection fee: 4.0% (4% of construction costs, minimum $150.00).
(19)
After-hours inspection fee: 4.5%.
(Ordinance 20-05 adopted 3/23/20)