(a) 
Development review committee fees.
Development review committee fees shall be collected for all proposals that include construction of public infrastructure or are of such a nature that the city staff believes that a formal review by the development review committee is necessary.
(b) 
Additional costs; administrative fee.
All costs associated with engineering, planning and attorney reviews in addition to the cost of any public notices that are incurred by the town will be charged to the applicant. One hundred percent (100%) of these costs (not covered by the application fee) plus a one hundred dollar ($100.00) administrative fee will be charged to the applicant and must be paid before any final plats will be filed, or, in the case of zoning changes, prior to the publication of the zoning change ordinance.
(Ordinance 537-12, art. II, adopted 11/20/12)
Zoning fees:
(1) 
Zoning change application fee (including specific use permit): $400.00.
(2) 
Zoning change reapplication fee: $300.00.
(Ordinance 537-12, art. II(A), adopted 11/20/12)
Development fees:
(1) 
Site plan review:
(A) 
Complete site plan (includes architectural, landscape and civil):
(i) 
Initial fee: $2,500.00.
(ii) 
Subs. fee: $1,250.00*.
(B) 
Site plan amendment: $500.00*.
(2) 
Development review committee appointment conference only (non-review): $200.00.
(3) 
Concept plan: $450.00.
(4) 
Sketch plat: $200.00.
(5) 
Development plat:
(A) 
Initial fee: $850.00.
(B) 
Subs. fee: $450.00.
(6) 
Minor subdivision platting fees (four lots or less, no infrastructure or drainage issues)*:
(A) 
Development review committee review (includes sketch plat): $200.00. Each subsequent DRC appointment: $100.00.
(B) 
Land study: $350.00.
(C) 
Final plat review fee: $450.00.
(D) 
Denton County filing fees: Actual cost.
(7) 
Major subdivision platting fees:
(A) 
Development review committee review (includes sketch plat): $600.00. Each subsequent DRC appointment: $250.00.
(B) 
Land study: $500.00.
Initial Fee
Subs. Fee
(C)
Preliminary plat review fee 
$1,200.00
$600.00
(D)
Engineering review fees as applicable:
 
 
 
(i)
Lighting/franchise utility plan (commercial)
$400.00
$200.00
 
(ii)
Sewer and water plan
$650.00
$350.00
 
(iii)
Topography and drainage plan
$650.00
$350.00
 
(iv)
Street and grading plan
$650.00
$350.00
 
(v)
Landscape plan
$450.00
$250.00
(E) 
Final plat review fee: $750.00.
(F) 
Subdivider’s agreement and review fee: $550.00.
Revision review: $350.00.
(G) 
Document legal review (per hour): $150.00.
(H) 
Performance/surety bonds: As required.
(I) 
Public improvements inspection and approval (based on estimated construction cost as determined by town engineer): 3.5% of construction costs.
(J) 
Denton County filing fees: Actual cost.
(8) 
Temporary batch plant permit: $400.00.
(9) 
Oil and gas well development plat: $950.00.
(10) 
Replat platting fee: See above. A replat shall be designated by the planning staff as either a major or a minor replat. Fees assessed will be that of a major or minor plat, as applicable.
(11) 
Plat vacating review fee: $450.00.
(12) 
Plat amendment review fee: $450.00.
(13) 
Deannexation fees, plus additional expenses incurred: $550.00.
(14) 
Board of adjustment fees: $450.00.
(A) 
Variance request.
(B) 
Other hearings.
*All costs associated with engineering, planning and attorney reviews in addition to the cost of any public notices that are incurred by the town will be charged against the application fee. One hundred percent (100%) of these costs (not covered by the application fee) plus a one hundred dollar ($100.00) administrative fee will be charged to the applicant and must be paid immediately upon receipt of invoice from the town. (Please note: $150.00 is nonrefundable.)
(Ordinance 537-12, art. II(B), adopted 11/20/12; Ordinance 714-21 adopted 9/21/21)