Inspector | Admin. Cost | Total Fee | ||
|---|---|---|---|---|
Plan review and initial acceptance inspections: | ||||
Base building only: | ||||
0 to 5,000 sq. ft. | $150.00 | $25.00 | $175.00 | |
5,001 to 15,000 sq. ft. | $200.00 | $25.00 | $225.00 | |
15,001 to 25,000 sq. ft. | $250.00 | $25.00 | $275.00 | |
25,001 to 50,000 sq. ft. | $350.00 | $25.00 | $375.00 | |
Over 50,001 sq. ft. | $500.00 | $25.00 | $525.00 | |
Water based fire suppression system inspection | $200.00 | $25.00 | $225.00 | |
Fire alarm system inspection | $250.00 | $25.00 | $275.00 | |
Mechanical hood/fire extinguishing system inspection | $150.00 | $25.00 | $175.00 | |
Reinspection fees | ||||
2nd inspection | $25.00 | $25.00 | $50.00 | |
3rd inspection or more | $50.00 | $25.00 | $75.00 | |
Portable fuel tank during construction inspection | $50.00 | $25.00 | $75.00 | |
Gas or oil well fire inspection | $1,000.00 | $25.00 | $1,025.00 | |
Gas or oil well tank farm (including piping from gas or oil well) | $1,000.00 | $25.00 | $1,025.00 | |
(Ordinance 07-13, ex. A, adopted 12/11/07)