|
|
Inspector
|
Admin. Cost
|
Total Fee
|
---|---|---|---|---|
Plan review and initial acceptance inspections:
|
|
|
| |
Base building only:
|
|
|
| |
0 to 5,000 sq. ft.
|
$150.00
|
$25.00
|
$175.00
| |
5,001 to 15,000 sq. ft.
|
$200.00
|
$25.00
|
$225.00
| |
15,001 to 25,000 sq. ft.
|
$250.00
|
$25.00
|
$275.00
| |
25,001 to 50,000 sq. ft.
|
$350.00
|
$25.00
|
$375.00
| |
Over 50,001 sq. ft.
|
$500.00
|
$25.00
|
$525.00
| |
Water based fire suppression system inspection
|
$200.00
|
$25.00
|
$225.00
| |
Fire alarm system inspection
|
$250.00
|
$25.00
|
$275.00
| |
Mechanical hood/fire extinguishing system inspection
|
$150.00
|
$25.00
|
$175.00
| |
Reinspection fees
|
|
|
| |
2nd inspection
|
$25.00
|
$25.00
|
$50.00
| |
3rd inspection or more
|
$50.00
|
$25.00
|
$75.00
| |
Portable fuel tank during construction inspection
|
$50.00
|
$25.00
|
$75.00
| |
Gas or oil well fire inspection
|
$1,000.00
|
$25.00
|
$1,025.00
| |
Gas or oil well tank farm (including piping from gas or oil
well)
|
$1,000.00
|
$25.00
|
$1,025.00
|