[Ord. No. 10-2022, 7/20/2022]
1.
The following items shall be included in the SWM site plan:
A.
Requirements from § 22-410 of the Subdivision and Land Development Ordinance, and other applicable ordinances, shall be followed in preparing the SWM site plans.
B.
The municipality shall not approve any SWM site plan that is deficient in meeting the requirements of this chapter. At its sole discretion and in accordance with this Part, when a SWM site plan is found to be deficient, the municipality shall disapprove the submission and require a resubmission.
D.
The following signature blocks:
(1)
"(Municipal official or designee), on this date (Signature date), has reviewed and hereby certifies that the SWM site plan meets all design standards and criteria of the Municipal Ordinance No. (number assigned to ordinance)."
(2)
Certificate, signed and sealed by a qualified professional, indicating compliance with the provisions of this chapter: "(Design Engineer), on this date (Signature date), has reviewed and hereby certified that the SWM site plan meets all design standards and criteria of the Borough of Conshohocken Stormwater Management Ordinance."
(3)
"(Owner), on this date (Signature date), acknowledges the stormwater BMPs and management facilities to be a permanent fixture that can be altered or removed only after approval by the Borough of Conshohocken of a revised plan, which shall be applicable to all future landowners."
E.
The SWM site plan shall provide the following information:
(1)
The overall stormwater management concept for the project.
(2)
A determination of site conditions in accordance with the BMP Manual.4[1] A detailed site evaluation, prepared by a qualified professional, shall be submitted for projects proposed in areas of carbonate geology or karst topography, and other environmentally sensitive areas, such as brownfields.
[1]
Editor's Note: See Part 9, References.
(3)
Stormwater runoff design computations and documentation as specified in this chapter, or as otherwise necessary to demonstrate that the maximum practicable measures have been taken to meet the requirements of this chapter, including the general requirements in § 19-301.
(4)
Expected project time schedule.
(5)
A soil erosion and sediment control plan, where applicable, as prepared for and submitted to the approval authority.
(6)
The effect of the project (in terms of runoff volumes, water quality, and peak flows) on surrounding properties and aquatic features and on any existing stormwater conveyance system that may be affected by the project.
(7)
Plan and profile drawings of all SWM BMPs, including drainage structures, pipes, open channels, and swales. Profiles shall be plotted along with the existing grade, proposed grade, and the hydraulic grade line information for the system. Profiles shall also include the pipe size, material, and slope, and the width of the channel or swale bottom, side slopes, bottom slope, and lining material.
(8)
Locations of existing and proposed on-lot wastewater facilities and water supply wells.
(9)
The SWM site plan shall include an O&M plan for all existing and proposed physical stormwater management facilities. This plan shall address long-term ownership and responsibilities for O&M as well as schedules and costs for O&M activities.