(a)
All construction and installation in the public rights-of-way shall be in accordance with the permit for the facilities. The town administrator or designee shall be provided access to the work and to such further information as may be reasonably required to ensure compliance with the permit.
(b)
A copy of the construction permit and engineering plans that have been reviewed and released for construction by the town administrator or designee shall be maintained at the construction site and made available for inspection by the town administrator or designee at all times when construction or installation work is occurring.
(Ordinance 06-224, sec. 2 (9.321), adopted 5/18/06)