(a) 
Demolition of building: $0.25/square foot.
(b) 
Electrical permits: $150.00.
(c) 
Electrical change-out: $50.00.
(d) 
Hot water heater change-out: $50.00.
(e) 
Driveways/culverts: $100.00.
(f) 
Mobile homes: $1,000.00.
(g) 
Move building: $500.00.
(h) 
Mechanical permits: $150.00.
(i) 
Plumbing permits: $150.00.
(j) 
Reinspections: $75.00.
(k) 
Re-roof: $100.00.
(l) 
Re-deck: $100.00.
(m) 
Swimming pool, in-ground: $600.00.
(n) 
Swimming pool, above-ground: $600.00.
(o) 
Pool fence: $75.00.
(p) 
Fire sprinklers: $200.00.
(q) 
Water wells: $500.00.
(r) 
Intersecting roads (Ordinance 06-217): $200.00 + professional fees.
(s) 
Traffic impact analysis fees (Ordinance 06-217): TBD by town.
(t) 
Use of public right-of-way (annual registration - Ordinance 06-224): $200.00.
(u) 
Major construction permit - right-of-way (Ordinance 06-224): $200.00 + professional fees.
(v) 
Road usage and repair: TBD by town.
(w) 
Onsite sewage facility (OSSF) fees: Fees detailed below plus professional fees:
(1) 
On-site sewage facility plan review: $100.00 per each review.
(2) 
On-site sewage facility final inspections: $200.00 per inspection.
(3) 
On-site sewage facility reinspection: $250.00.
(4) 
On-site sewage facility complaints (complaints shall come through the town or from TCEQ): $250.00 per complaint investigation.
(5) 
Administrative duties resulting from OSSF enforcement, as well as, state OSSF program audits/reviews: $25.00 per hour.
(6) 
Subdivision review (for conformance with 30 TAC 285 OSSF regulations): $250.00.
(7) 
Development plan review (for conformance with 30 TAC 285 OSSF Regulations): $250.00.
(8) 
Plat/re-plat review (for conformance with 30 TAC 285 OSSF regulations): $250.00.
(9) 
Building permit review (pool, shed, barn, cabana, retaining walls or other surface improvements that may impact an OSSF, including excavation or fill): $100.00 per each review.
(10) 
Water well permit review: $100.00 per each review.
(11) 
Ordinance review: $200.00 per each review.
(x) 
Foundation repair: $100.00.
(y) 
Irrigation system: $200.00.
(z) 
Flatwork: $100.00.
(aa) 
Propane tank: $75.00.
(bb) 
Pond: $100.00 plus professional fee.
(cc) 
Grading: $150.00 + plus professional fee.
(dd) 
Sign: $50.00.
(ee) 
Culvert: $75.00 + professional fees.
(Ordinance 06-225, sec. 1, adopted 6/12/06; Ordinance 15-018 adopted 9/14/15; Ordinance 19-014, sec. 2, adopted 10/14/19; Ordinance 24-009 adopted 10/28/2024)